County Permit SearchU.S. compliance directory
WisconsinKenosha County

Administrative overview · FIPS 55059

Kenosha County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Kenosha County Division of Planning & Development

For a project in or near Kenosha County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

262-857-1895

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

19600 75th Street, Suite 185-3, Bristol, WI 53104-9772

Operating hours

Monday-Friday, 8:00 AM-12:00 PM and 1:00 PM-5:00 PM; appointments are required for in-person meetings with Planning & Development staff.

Review expectation

Complete commercial zoning-permit applications are typically reviewed in approximately 7-10 working days; other project timelines are N/A.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Kenosha County

Who handles permitting for this jurisdiction?

Kenosha County Division of Planning & Development is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 262-857-1895.

How long might review take?

Complete commercial zoning-permit applications are typically reviewed in approximately 7-10 working days; other project timelines are N/A.

How are inspections scheduled?

Obtain the county zoning permit first, then contact the applicable town/municipality or its contracted building inspector to schedule UDC/building inspections; the county portal identifies the responsible office by municipality. For principal buildings, additions, and detached accessory buildings over 150 square feet, submit a professional foundation survey by the permit deadline to verify size and setbacks. For county sanitation inspections call the County Sanitarian through 262-857-1895.

Which codes and exemptions should I review?

Kenosha County General Zoning and Shoreland/Floodplain Zoning Ordinance (Chapter 12), county Construction Site Erosion Control and Stormwater Management Ordinance, Subdivision Control Ordinance, and Sanitary/POWTS Ordinance. County zoning applies in the unincorporated towns of Brighton, Paris, Randall, Somers, and Wheatland; Wisconsin building-code/UDC permits and inspections are administered by the applicable local municipality or contracted inspector. County zoning-permit exemptions include detached accessory structures of 150 square feet or less (subject to district count, height, and setbacks); uncovered, unenclosed entry decks/landings no larger than 4 by 6 feet that meet stated setbacks; pools capable of holding no more than 18 inches of water; qualifying removable non-habitable farm structures; handicap ramps, qualifying construction trailers and temporary storage containers, flagpoles, mailboxes, and play equipment other than pools or tennis courts. Local building permits may still be required.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?