County Permit SearchU.S. compliance directory
West VirginiaTyler County

Administrative overview · FIPS 54095

Tyler County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Tyler County Office of Emergency Management Floodplain Management Office

For a project in or near Tyler County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

304-758-5155

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

504 Cherry Street, Middlebourne, WV 26149

Operating hours

Monday-Friday, 8:00 a.m.-4:00 p.m.; call before visiting

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Tyler County

Who handles permitting for this jurisdiction?

Tyler County Office of Emergency Management Floodplain Management Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 304-758-5155 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Submit the two-page application, one copy of plans and specifications, and a WV Flood Tool location map to Floodplain Manager Tom Cooper. Call 304-758-5155 to coordinate review and inspections. The Administrator may inspect during construction and later inspect permitted development for alterations; flood-hazard-area occupancy and permanent utility approval require a certificate of compliance based on inspections and any required finished elevation, floodproofing, hydraulic, or encroachment documents. Work must start within 180 days and finish within 18 months unless a written extension is granted.

Which codes and exemptions should I review?

Tyler County Floodplain Ordinance and National Flood Insurance Program development standards. A county permit or certificate of compliance is required before development, new construction, substantial improvement, substantial-damage repair, or placement/relocation of a structure. The county publishes no general structural model building-code suite. No general minor- or cosmetic-work exemption is published. The ordinance requires a permit before building any structure or dwelling in the county; even projects outside the 100-year floodplain require the $25 determination permit. Public utilities and government entities must also comply unless specifically exempted by law and must document any claimed exemption.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?