County Permit SearchU.S. compliance directory
West VirginiaUpshur County

Administrative overview · FIPS 54097

Upshur County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Upshur County Addressing and Mapping, Building Permits and Floodplain Management

For a project in or near Upshur County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

304-472-1673

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Judge Jack Dowell Jennings Annex, 38 West Main Street, Room 303, Buckhannon, WV 26201

Operating hours

Operating hours not verified

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Upshur County

Who handles permitting for this jurisdiction?

Upshur County Addressing and Mapping, Building Permits and Floodplain Management is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 304-472-1673 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Submit the application, site plan, contractor license, proof of workers' compensation, and insurance certificate to the county office. During construction the Permit Officer or another authorized official may inspect the property for consistency with the application and applicable laws; the application expressly grants county officials entry to review, verify, or appraise the work. Call 304-472-1673 to coordinate review or an inspection. Work must begin within six months unless a written extension is approved.

Which codes and exemptions should I review?

Upshur County Building Permit Ordinance and the 2023 revised Upshur County Floodplain Ordinance. A county permit is required before site preparation, development, renovation, improvement, construction, or relocation of a building or structure, including manufactured and prefabricated housing, in all unincorporated areas; projects within Buckhannon city limits are referred to the city. The county permit does not represent adoption or enforcement of a general structural model building-code suite. No project-cost exemption from permitting is published. A permit remains required for every covered activity in the unincorporated county, but the $15 fee is waived when the completed construction cost, including materials and labor, is less than $250.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?