Administrative overview · FIPS 54093

Tucker County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Tucker County Floodplain Administration

For a project in or near Tucker County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

304-478-3727 ext. 5322

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

215 First Street, Parsons, WV 26287

Operating hours

Monday-Friday, 8:00 a.m.-4:00 p.m.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Tucker County

Who handles permitting for this jurisdiction?

Tucker County Floodplain Administration is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 304-478-3727 ext. 5322 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Submit the application and $25 nonrefundable fee to Floodplain Administrator Shawn Marker. Floodplain sites require initial and final elevation certificates reviewed by the county; the application site sketch is also used for possible inspections or assessment. Call 304-478-3727 ext. 5322 to coordinate review and inspections. Work must begin within six months; the permit expires after one year unless an extension is requested before expiration.

Which codes and exemptions should I review?

Tucker County Flood Plain Ordinance dated September 2014, FEMA/National Flood Insurance Program standards, the county Development Permit Policy, and the Canaan Valley Zoning Ordinance within that zoning district. All development in the county requires a development permit; incorporated Davis, Hambleton, Hendricks, Parsons, and Thomas issue their own permits, while the county handles unincorporated areas including the Canaan Valley Zoning District. The county does not enforce a general structural model-code suite countywide. All development requires a permit, but the $25 application fee is waived for buildings qualifying for agricultural, church, or similar exempt status. Septic-permit documentation may be waived for additions that do not add bedrooms or bathrooms, chicken houses, and nonresidential barns/outbuildings. Well-permit documentation may be waived for a well existing before July 1, 1985.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?