West VirginiaMineral County

Administrative overview · FIPS 54057

Mineral County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Mineral County Planning Commission

For a project in or near Mineral County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

304-788-1321

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Mineral County Health Department, 541 Harley O. Staggers Drive, Suite 1, Keyser, WV 26726

Operating hours

Monday-Friday, 8:00 a.m.-4:00 p.m.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Mineral County

Who handles permitting for this jurisdiction?

Mineral County Planning Commission is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 304-788-1321 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Contact County Planner and Floodplain Coordinator Philip Shepp II at 304-788-1321 or countyplanning@mineralwv.org. The county does not publish a general building-inspection sequence; proposed floodplain construction must receive written Planning Department authorization before work starts.

Which codes and exemptions should I review?

Mineral County Floodplain Ordinance, Subdivision Ordinance, zoning regulations, Building Safety Enforcement Agency requirements, and FEMA floodplain requirements; the county does not publish adoption of a general structural building-code suite. No minor- or cosmetic-work exemption is published. The county requires permits for all residential, recreation/vacation, agricultural, and commercial improvements that are erected, enlarged, moved, altered, or remodeled, including site-built and manufactured buildings, additions, assembled kits, sheds, decks, pools, barns, garages, and demolition or removal. Demolition permits have no fee but are still required.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?