Administrative overview · FIPS 51149
Prince George County permit authority
The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.
Jurisdictional status
County
This county profile is the primary starting point for unincorporated-area permitting.
Responsible agency
Prince George County Department of Community Development and Code Compliance, Building Inspections Division
For a project in or near Prince George County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.
Direct contact
804-722-8659
Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.
Permit counter
6602 Courts Drive, Prince George, VA 23875
Operating hours
Operating hours not verified
Review expectation
Ask the agency for its current review estimate
Compliance workbench
Choose the next project decision.
Apply online
Open the verified digital gateway, application form, and review timeline.
Open guide →Fees & penalties
Understand fee schedules, enforcement exposure, and stop-work liabilities.
Open guide →Codes & exemptions
Read the code framework, minor-work exemptions, and inspection lane.
Open guide →Agency website
Visit the primary public source for current notices and contact changes.
Open guide →Source trail
Official sources for this profile
Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.
Project questions
Frequently asked questions for Prince George County
Who handles permitting for this jurisdiction?
Prince George County Department of Community Development and Code Compliance, Building Inspections Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.
How should I begin an application?
No verified online portal was located in the reviewed public materials. Contact 804-722-8659 and request the current application route before preparing a final submittal.
How long might review take?
A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.
How are inspections scheduled?
Use the county's 24-hour VIP interactive voice-response line at 804-722-8787. Press 1 to schedule, 2 to cancel or reschedule, or 3 for results; have the site-specific permit number and the inspection code from the county's VIP reference guide. The system supports building, electrical, plumbing, mechanical, fire, zoning-compliance, demolition, pool, sign, tent, and other inspection types.
Which codes and exemptions should I review?
2021 Virginia Uniform Statewide Building Code, including the 2021 Virginia Construction Code, 2021 Virginia Residential Code, 2021 Virginia Existing Building Code, 2021 Virginia Property Maintenance Code, 2021 Virginia Energy Conservation Code, 2021 Virginia Mechanical Code, 2021 Virginia Plumbing Code, 2021 Virginia Fuel Gas Code, and 2020 National Electrical Code. The county hosts the 2021 Virginia Construction Code, effective January 18, 2024, and its Building Inspections Division administers the statewide code. Virginia's statewide exemptions include qualifying low-voltage wiring; one-story detached tool/storage sheds, playhouses, and similar structures not exceeding 256 square feet; qualifying tents up to 900 square feet with 50 or fewer occupants; fences unless required for pedestrian safety or used as a pool barrier; masonry walls not over 6 feet; qualifying low retaining walls and small shallow pools; flagpoles not over 30 feet; minor and ordinary work; and specified like-for-like ordinary repairs and cosmetic work. Prince George County requires an Exempt Structure Application and warns that environmental, zoning, floodplain, Health Department, and VDOT approvals may still be required; additions and new structures require a zoning-permit application and setback plan.