County Permit SearchU.S. compliance directory
VirginiaHighland County

Administrative overview · FIPS 51091

Highland County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Highland County Department of Building and Zoning

For a project in or near Highland County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

540-468-2323

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

30 Spruce Street, Monterey, VA 24465

Operating hours

Monday-Friday, 9:00 a.m.-4:00 p.m.; closed Saturday-Sunday. The Building Inspector/Zoning Administrator is unavailable for inspections or permit issuance on the second Thursday of each month due to training.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Highland County

Who handles permitting for this jurisdiction?

Highland County Department of Building and Zoning is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 540-468-2323 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

The permit holder must notify the Building Official at 540-468-2323 before concealing work that requires inspection. The county checklist identifies footing, foundation, pre-concrete, framing, concealed electrical/mechanical/plumbing, insulation, and final inspections; framing and trade rough-ins are usually inspected together. The inspector is unavailable on the second Thursday of each month, and incomplete work may incur a reinspection fee.

Which codes and exemptions should I review?

2021 Virginia Uniform Statewide Building Code, including the 2021 Virginia Construction Code, 2021 Virginia Residential Code, 2021 Virginia Existing Building Code, 2021 Virginia Property Maintenance Code, 2021 Virginia Energy Conservation Code, 2021 Virginia Mechanical Code, 2021 Virginia Plumbing Code, 2021 Virginia Fuel Gas Code, and 2020 National Electrical Code. These statewide 2021 editions became effective January 18, 2024; the county microsite's displayed 2015 list is outdated. Virginia's statewide permit exemptions include qualifying low-voltage wiring, detached one-story accessory structures within the code's 256-square-foot threshold, qualifying small tents, fences and low retaining walls, ordinary painting, wallpapering, floor finishes, cabinets and trim, and specified replacement or repair work, while zoning and other code requirements remain applicable. Highland County separately publishes a farm-structure exemption for nonresidential buildings on operating farms used primarily for production, storage, animal shelter/processing, farm offices, farm machinery, or farm supplies; county zoning approval is still required.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?