Who issues permits

City of Alexandria Department of Code Administration is the county office listed for building permits in Alexandria city.

Also listed: Alexandria Permit Center.

How to get a permit in Alexandria city

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the portal at apex.alexandriava.gov.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Review times

Published plan-review targets are 20 business days for commercial and multifamily projects and 10 business days for one- and two-family residential projects unless eligible for walk-through review. Minor walk-through projects are scoped for a 20-minute Code Administration review; Permit Center support inquiries are answered within 24 hours or one business day.

Search Alexandria city permit records

The listing’s online portal is at apex.alexandriava.gov ↗. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask City of Alexandria Department of Code Administration at 703-746-4200. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

City of Alexandria Department of Code Administration publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

The 2021 Virginia Uniform Statewide Building Code became effective January 18, 2024. Alexandria administers the 2021 Virginia Construction, Residential, Existing Building, Plumbing, Mechanical, Fuel Gas, Energy Conservation, and Property Maintenance codes with Virginia amendments; the city's current plan-review requirements direct electrical designs to the 2023 National Electrical Code.

Virginia: statewide code. Details

Work that may not need a permit

Virginia Construction Code Section 108.2 exemptions include qualifying one-story detached sheds, playhouses, and similar structures not over 256 square feet; fences unless used for pool barriers or required for construction-site pedestrian safety; swimming pools not over 150 square feet and less than 24 inches deep; qualifying low-voltage wiring; limited roof-deck replacement of 256 square feet or less on R-3/R-4/R-5 buildings; floor finishes; qualifying interior wall or ceiling finishes; cabinetry and trim; paint and wallpaper; and other minor ordinary repairs approved by the building official. Exempt work remains subject to all other applicable code and zoning requirements.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Schedule and track inspections online through APEX; the Permit Center page also links a Daily Inspection Viewer with step-by-step scheduling instructions. If APEX is unavailable, call 703-746-4200 during regular business hours for scheduling assistance. Occupied-dwelling residential inspections may be conducted virtually by video call under the city's current operations notice.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Work begun without a required permit, or work exceeding an issued permit after a stop-work order, incurs an administrative fee of $250 for one- and two-family residential work or $500 for all other work, in addition to the regular permit fee for each cited permit or trade. The building official may issue a written stop-work order for work contrary to code, law, or ordinance or endangering the public. More than one reinspection for the same violation or failed access costs $72, and no further reinspection or permanent certificate of occupancy is provided until outstanding inspection fees are paid.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Virginia rules that apply in Alexandria city

These rules come from Virginia law and state agencies, so they apply in Alexandria city on top of anything the local office requires.

Building code

Statewide code

The 2021 USBC took effect January 18, 2024. It is made up of the Virginia Construction Code (based on the 2021 IBC), the Virginia Residential Code (2021 IRC with Virginia amendments) for one- and two-family homes and townhouses, and the 2021 I-codes for mechanical, plumbing, fuel gas and energy.

Read more

Electrical work follows the 2020 NEC (NFPA 70). Localities may not amend the code. A one-year transition, during which the 2018 code could also be used, ended January 18, 2025. The Board of Housing and Community Development is working on a 2024 edition, but it had not been adopted as of October 2026.

Virginia Department of Housing and Community Development (DHCD), State Building Codes Office; codes adopted by the Board of Housing and Community Development ↗

Outside city limits

Every county must enforce the USBC (Va. Code § 36-105), so building permits are required in unincorporated areas. A county without its own building department must contract with another locality or an approved agency. Towns under 3,500 people may run their own building department. If they don't, the county enforces the code inside the town.

Contractor and trade licensing

Anyone who takes on construction work worth more than $1,000 for others needs a DPOR contractor license. The class depends on job size. Class C covers single jobs over $1,000 and under $30,000, or under $250,000 of work in 12 months.

Read more

Class B covers single jobs from $30,000 to under $150,000, or $250,000 to under $1 million a year. Class A covers single jobs of $150,000 or more, or $1 million or more a year (Va. Code § 54.1-1100). Owners are exempt from contractor licensing when working on no more than one primary residence they own and live in during any 24-month period. They must still follow the USBC, and if they sell to an outside buyer without a certificate of occupancy, the buyer must agree to that in writing (§ 54.1-1101). The USBC lets the owner, a lessee, or their agent apply for a permit. Applicants must show a DPOR license or file a written statement that they are not required to be licensed (VCC 108.3–108.4; § 54.1-1111).

Electrical, plumbing and HVAC

The Board for Contractors also licenses individual tradesmen at the journeyman and master levels in electrical, plumbing, HVAC and gas fitting. It offers limited residential plumbing and residential HVAC licenses, and certifies backflow prevention workers, elevator mechanics and water well providers.

Read more

Electrical, plumbing and mechanical permits and inspections are handled by the local building department under the USBC. Virginia does not run a separate state electrical inspection program.

State programs that can affect your permit

Onsite sewage systems and private wells (Virginia Department of Health)

Homes on a septic system or private well need permits through the Virginia Department of Health. Applications go through the local health department, separate from the building permit.

Official page: vdh.virginia.gov ↗

Manufactured Home Safety Regulations

DHCD is the state agency for HUD's manufactured housing program and enforces the Virginia Manufactured Home Safety Regulations (13VAC5-95). These apply federal construction and installation standards and require installers to hold a DPOR license. Local building departments handle permits and inspections for setting up a home.

Official page: law.lis.virginia.gov ↗

Verified October 28, 2026 against Virginia sources. Virginia permit rules, sources and other counties

Common projects in Alexandria city

Virginia has statewide rules on file for 6 of these projects; they apply in Alexandria city along with local permit requirements.

Named in Alexandria city’s exemption summary (read it before assuming the work is exempt): Decks

Guides for other projects: Heating and air conditioning · Electrical work · Rooftop solar · Demolition · Plumbing work · Septic systems · Driveways and culverts · Floodplain development · All 21 project guides

Other permits you may need in Alexandria city

These are separate from the building permit and come from the agencies named, under Virginia rules.

  • Septic system

    Virginia Department of Health (VDH), through local health departments

    Onsite sewage system construction permits are issued by VDH through local health departments under the Sewage Handling and Disposal Regulations (12VAC5-610). Since August 11, 2019, every application for an onsite sewage system or private well must include site evaluation and design work by a private-sector consultant licensed through DPOR, unless the owner qualifies for VDH services under income or hardship guidelines.

    Read more

    After installation the system is inspected, and VDH issues an operation permit before the system can be used; VDH does not require any septic inspection when a property is bought or sold.

    Official page: vdh.virginia.gov ↗ · Septic permit guide

  • Floodplain development

    Virginia Department of Conservation and Recreation (DCR)

    DCR's Floodplain Management Program is Virginia's designated coordinating agency for the National Flood Insurance Program and assists local floodplain administrators with ordinances, permit processes and flood maps. Floodplain development permits are issued by the county, city or town under its local floodplain ordinance.

    Official page: dcr.virginia.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Virginia Department of Transportation (VDOT)

    Building a private or commercial entrance (driveway) onto a road in the state highway system requires a VDOT Land Use Permit, as does modifying an existing entrance because of a change in land use, traffic volume or type of traffic.

    Read more

    Permits are usually obtained from the VDOT district or residency office serving the locality, and entrances are reviewed under VDOT's access management regulations and standards. For streets maintained by a city or town, check with the locality.

    Official page: vdot.virginia.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Virginia DEQ and the local erosion and stormwater program

    Under the Virginia Erosion and Stormwater Management Act, land disturbance of 10,000 square feet or more (2,500 square feet or more in a Chesapeake Bay Preservation Area, including for a single-family home) needs an approved erosion control plan, or for a single-family home an agreement in lieu of a plan, and land-disturbance approval before work begins; localities may set lower thresholds (Va.

    Read more

    Code 62.1-44.15:34). Counties, cities and towns administer these programs, and disturbance of 1 acre or more, or less as part of a larger common plan of development or sale, may also require state construction stormwater permit coverage. Minor activities such as home gardens, individual home landscaping, repairs and maintenance are exempt.

    Official page: law.lis.virginia.gov ↗

  • Water well

    Virginia Department of Health (VDH), through local health departments

    No one may construct, alter, deepen or abandon a private well without a written construction permit from VDH, and a well may not be put into use without a VDH inspection statement (12VAC5-630-220). Within 30 days of completing the work, the owner, agent or water well systems provider must give the local health department a uniform water well completion report signed by the provider (12VAC5-630-310). Replacing a well pump or an equivalent well cap is not considered an alteration.

    Official page: law.lis.virginia.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Alexandria city office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 703-746-4200 if you are unsure.

Can I apply for a permit online in Alexandria city?

Yes. The listing includes an online permit portal at apex.alexandriava.gov. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Alexandria city?

City of Alexandria Department of Code Administration publishes its fee schedule online (alexandriava.gov). Look up your project type there, and ask the office at 703-746-4200 for an estimate if your project is not listed.

How do I look up past permits for an address in Alexandria city?

Start with the portal at apex.alexandriava.gov and search by address, parcel or permit number. If an older permit is not there, ask the office at 703-746-4200 for the file or send a public records request.

Can I check a contractor's license for work in Alexandria city?

Yes, at dpor.virginia.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Alexandria city line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Alexandria city borders Arlington County, Fairfax County, District of Columbia (District of Columbia), Prince George's County (Maryland).

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Alexandria city.