County Permit SearchU.S. compliance directory
TexasWinkler County

Administrative overview · FIPS 48495

Winkler County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Winkler County Commissioners' Court and OSSF Authorized Agent

For a project in or near Winkler County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

County Judge Charles M. Wolf: 432-586-6658; Commissioners Court/County Clerk: 432-586-3401; county commissioners: 432-586-2233

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Winkler County Courthouse, 100 East Winkler Street, Kermit, TX 79745; County Judge mailing address: P.O. Drawer Y, Kermit, TX 79745-1007

Operating hours

Operating hours not verified

Review expectation

No fixed county construction, driveway, or inspection turnaround is published. Texas OSSF rules require the permitting authority to approve or deny a complete septic application and planning materials within 30 days of receipt and give a written explanation for denial. A county-road driveway permit becomes void if the authorized facilities are not constructed within 90 days after issuance.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Winkler County

Who handles permitting for this jurisdiction?

Winkler County Commissioners' Court and OSSF Authorized Agent is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact County Judge Charles M. Wolf: 432-586-6658; Commissioners Court/County Clerk: 432-586-3401; county commissioners: 432-586-2233 and request the current application route before preparing a final submittal.

How long might review take?

No fixed county construction, driveway, or inspection turnaround is published. Texas OSSF rules require the permitting authority to approve or deny a complete septic application and planning materials within 30 days of receipt and give a written explanation for denial. A county-road driveway permit becomes void if the authorized facilities are not constructed within 90 days after issuance.

How are inspections scheduled?

For septic work, submit the county's seven-page OSSF information-and-forms packet and required site evaluation and planning materials to the county authorized agent; obtain Authorization to Construct before installation, coordinate required inspections through the County Judge/Commissioners Court at 432-586-6658 or 432-586-3401, and do not operate the system until approval. For a county-road driveway, obtain written county approval first, have underground utilities marked through Dig-Tess at 800-344-8377, notify the County Judge and applicable precinct commissioner at least 24 hours before work, and make all construction and materials available for commissioner or designee inspection and approval.

Which codes and exemptions should I review?

Winkler County is a TCEQ-authorized OSSF agent and administers septic permitting under Texas Health and Safety Code Chapter 366 and 30 TAC Chapters 30 and 285. The official permit page also publishes county construction guidance, pipeline-crossing permits, and county-road driveway permits. No specific 2026 countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition is published, and the regional flood plan records the county's floodplain-management regulations as unknown with no higher standards identified; exact structural and floodplain codes are therefore N/A. Incorporated municipalities administer their own building and zoning requirements. The county publishes no verified cosmetic- or minor-building-work exemption list. Under state OSSF rules, the conditional 10-acre exemption requires a licensed site evaluation, one single-family dwelling on a tract of at least 10 acres, every system component at least 100 feet from property lines, retention of all effluent onsite, and no nuisance or groundwater pollution. Listed emergency OSSF repairs may proceed without an advance permit but must be reported to the permitting authority in writing within 72 hours after work begins. County-road driveway and pipeline work are not exempt from their respective written-approval requirements.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?