Who issues permits

San Augustine County Judge/Floodplain Administration is the county office listed for building permits in San Augustine County.

Also listed: Angelina & Neches River Authority OSSF Department.

How to get a permit in San Augustine County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Fill in the application from anra.org and submit it as the form directs.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Review times

ANRA says it usually completes the OSSF permit process within a matter of days; Texas law allows up to 30 days to issue the Permit to Construct. The permit is valid for one calendar year, after which a new application and fee are required if the construction inspection was not requested. No county floodplain review time was published.

Search San Augustine County permit records

No online permit portal is listed, so permit history is kept by San Augustine County Judge/Floodplain Administration. Call 936-275-2762 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

San Augustine County Judge/Floodplain Administration publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

The County Judge is designated as San Augustine County Floodplain Administrator under the county's current posted Flood Damage Prevention Court Order and administers floodplain development permits under the NFIP and 44 CFR. The county also publishes permits for culverts, heavy hauling, and pipeline work but no 2026 general structural building-code edition or ordinary residential building-permit program. ANRA is the TCEQ-authorized OSSF agent for San Augustine County and enforces Texas Health and Safety Code Chapter 366, 30 TAC Chapter 285, applicable 30 TAC Chapter 30 licensing rules, and its TCEQ-approved local OSSF order.

Texas: partial statewide code. Details

Work that may not need a permit

No county minor-building or cosmetic-work exemption list was published. ANRA states that an OSSF permit is required to construct, alter, repair, extend, or operate a system when sewer is unavailable, except qualifying systems installed before the effective date of an approved pre-September 1, 1989 local order, ordinance, or resolution. Do not assume a state acreage or repair exception applies without ANRA confirmation.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

For floodplain development, submit the county's furnished application and required plans to the County Judge/Floodplain Administrator at 936-275-2762. For an OSSF, obtain ANRA's Permit to Construct before work; after installation the installer must contact ANRA for closing inspection within five days and request the inspection at least five working days before the system will be ready. Do not cover or operate the system until inspected and licensed.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

ANRA may revoke an OSSF License to Operate when a system is not maintained to state standards and becomes a health hazard; owners may also face fines and legal action, and operating an aerobic system without a valid license is illegal. Current fees effective May 1, 2025 are $435 total for single-family residential, $585 for non-single-family light, and $1,410 for non-single-family heavy permits; reinspection is $200 and redesign is $150. County floodplain development requires prior approval, but no fixed county floodplain fine, double fee, or stop-work amount was published in the verified material.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Texas rules that apply in San Augustine County

These rules come from Texas law and state agencies, so they apply in San Augustine County on top of anything the local office requires.

Building code

Partial statewide code

Local Government Code §214.212 adopts the International Residential Code as it existed on May 1, 2012 as the municipal residential building code, applying to construction, alteration, remodeling, enlargement, and repair of residential structures in a municipality.

Read more

Cities may add, modify, or remove requirements through local amendments adopted by ordinance after a public hearing. §214.216 does the same for commercial buildings using the International Building Code (May 1, 2012). These codes do not apply to the installation and maintenance of electrical wiring (§214.213). Statewide, the residential energy code is the energy-efficiency chapter of the 2015 IRC, effective September 1, 2016 (Health and Safety Code §388.003).

Texas Legislature (Local Government Code Chapter 214); State Energy Conservation Office for the energy code ↗

Outside city limits

Outside city limits, Texas counties have limited building authority. Under Local Government Code Chapter 233, Subchapter F, a county that adopts an order opting in can require new single-family homes and duplexes (and additions that increase square footage or value by more than 50 percent) to conform to the IRC as published on May 1, 2008, or to the IRC that applies in the county seat.

Read more

The law does not require prior county approval before construction begins, and the county may not charge a fee to enforce the standards. Instead, the builder contracts for at least three inspections (foundation before concrete, framing and mechanical before drywall, and completion) by a licensed engineer, registered architect, TREC-licensed professional inspector, or other qualified inspector listed in the statute. The county may require notice before work starts and a report of the final inspection. On-site sewage (septic) permits are separate and required throughout the state.

Contractor and trade licensing

Texas abolished its Texas Residential Construction Commission on September 1, 2009, and our review of state sources found no state license for general or residential building contractors. The state does license trades: electricians and air conditioning and refrigeration contractors through TDLR, and plumbers through the Texas State Board of Plumbing Examiners.

Read more

Homeowners have state-law exemptions for some work on their own homes (see the trade section), but cities can still require permits and inspections.

Electrical, plumbing and HVAC

Electrical: TDLR says anyone who performs electrical work in Texas must be licensed, but Occupations Code §1305.003(a)(6) exempts work "not specifically regulated by a municipal ordinance" that is performed in or on a dwelling by a person who owns and lives in it.

Read more

City rules can override this exemption. Plumbing: plumbers are licensed by the Texas State Board of Plumbing Examiners, and a property owner does not need a license to do plumbing in their own homestead (§1301.051). HVAC: air conditioning and refrigeration contractors are licensed by TDLR, and the licensing chapter does not apply to work in a building owned solely by the person as their home (§1302.053). These exemptions cover state licensing only. Local permits and inspections may still be required.

State programs that can affect your permit

On-site sewage facilities (septic)

TCEQ rules require a permit and approved plan to construct, alter, repair, extend, or operate an on-site sewage facility. Permits are usually issued by a local authorized agent, often the county. Where no local authority exists, the TCEQ regional office issues them. The rules are in 30 TAC Chapter 285.

Official page: tceq.texas.gov ↗

Statewide residential energy code

The State Energy Conservation Office administers the single-family energy code: Chapter 11 of the 2015 IRC, effective September 1, 2016. Outside city limits, compliance can be shown through an accredited program, inspections by code-certified inspectors, or a builder certification form (Health and Safety Code §388.004).

Official page: comptroller.texas.gov ↗

Floodplain management

Building in mapped flood hazard areas is subject to local floodplain management rules under the National Flood Insurance Program, and your community may require a floodplain development permit. The Texas Water Development Board's NFIP page notes that the state does not keep elevation certificates on file, but your local floodplain administrator should.

Official page: twdb.texas.gov ↗

Verified October 28, 2026 against Texas sources. Texas permit rules, sources and other counties

Common projects in San Augustine County

Texas has statewide rules on file for 5 of these projects; they apply in San Augustine County along with local permit requirements.

  • Roof replacement

    Texas Property Code §202.011 limits property owners' associations from prohibiting shingles designed to be wind or hail resistant, energy efficient, or solar generating, subject to conditions in the statute.

    Texas source: tcss.legis.texas.gov ↗ · Roof replacement permit guide

  • Water heaters

    A property owner does not need a state plumbing license to do plumbing in their own homestead (Occupations Code §1301.051). City permit and inspection requirements still apply.

    Texas source: tcss.legis.texas.gov ↗ · Water heaters permit guide

  • Heating and air conditioning

    State air conditioning and refrigeration licensing does not apply to work in a building owned solely by the person as their home (Occupations Code §1302.053). Other HVAC contractors need a TDLR license, and city permits still apply.

    Texas source: tcss.legis.texas.gov ↗ · Heating and air conditioning permit guide

  • Electrical work

    State law exempts electrical work on a dwelling by a person who owns and resides in it from state licensing, but only for work not specifically regulated by a municipal ordinance (Occupations Code §1305.003(a)(6)).

    Read more

    Cities can still require permits and licensed electricians. Texas Property Code §202.019 limits HOA restrictions on permanently installed standby electric generators.

    Texas source: tdlr.texas.gov ↗ · Electrical work permit guide

  • Rooftop solar

    Texas Property Code §202.010 generally prohibits property owners' associations from prohibiting or restricting the installation of solar energy devices. Exceptions allow HOAs to limit devices on common property, devices that extend above or beyond the roofline, devices in a fenced yard that are taller than the fence, and installations made without the association's prior approval, among others.

    Texas source: tcss.legis.texas.gov ↗ · Rooftop solar permit guide

Guides for other projects: Decks · Fences · Sheds and accessory buildings · Pools and spas · Accessory dwelling units · Demolition · Plumbing work · Septic systems · All 21 project guides

Other permits you may need in San Augustine County

These are separate from the building permit and come from the agencies named, under Texas rules.

  • Septic system

    TCEQ or its local authorized agent

    A permit and approved plan are required to construct, alter, repair, extend or operate an on-site sewage facility (OSSF) under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. Most permits are issued by a local authorized agent of TCEQ (such as a county, city or health district), and the TCEQ regional office is the permitting authority where no local program is authorized; local rules can be stricter.

    Read more

    The process starts with a site evaluation, including a soil analysis, by a TCEQ-licensed site evaluator or professional engineer, and the permitting authority must approve or deny the application within 30 days.

    Official page: tceq.texas.gov ↗ · Septic permit guide

  • Floodplain development

    Texas Water Development Board (TWDB)

    TWDB houses the state NFIP coordinator, and its Flood Community Assistance Program supports local floodplain management with training and technical help. Cities and counties in the NFIP adopt a flood damage prevention ordinance, and the local floodplain administrator issues floodplain development permits for work in the special flood hazard area.

    Official page: twdb.texas.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Texas Department of Transportation (TxDOT)

    A TxDOT permit is required before building an access connection (driveway) to a state highway, or before a change in property use or traffic that would trigger stricter access standards (43 TAC 11.52).

    Read more

    The TxDOT district engineer approves permits that meet the Access Management Manual, and an engineering study may be required. For county roads and city streets, check with the county or city.

    Official page: law.cornell.edu ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Texas Commission on Environmental Quality (TCEQ)

    Construction that disturbs 1 acre or more, or is part of a larger common plan of development or sale that will disturb 1 acre or more, needs coverage under TCEQ's Construction General Permit (TXR150000) if it discharges stormwater to surface water.

    Read more

    Operators must prepare and follow a Stormwater Pollution Prevention Plan (SWP3) before construction starts. Clearing or building in the Edwards Aquifer recharge and contributing zones may have additional requirements, handled by TCEQ regional offices.

    Official page: tceq.texas.gov ↗

  • Water well

    Texas Department of Licensing and Regulation (TDLR)

    TDLR licenses water well drillers and pump installers. Within 60 days after drilling, deepening or altering a well, the driller must send a State of Texas Well Report to TDLR, the well owner and the local groundwater conservation district, if there is one (16 TAC 76.70). Groundwater conservation districts set their own rules, so check with the district for your area.

    Official page: law.cornell.edu ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the San Augustine County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 936-275-2762 if you are unsure.

Can I apply for a permit online in San Augustine County?

No online permit portal was found for this listing. The agency does publish application forms and a fee schedule online, which may need to be submitted by mail or in person. Contact the office at 936-275-2762 to ask how applications are accepted.

How much does a building permit cost in San Augustine County?

San Augustine County Judge/Floodplain Administration publishes its fee schedule online (anra.org). Look up your project type there, and ask the office at 936-275-2762 for an estimate if your project is not listed.

How do I look up past permits for an address in San Augustine County?

There is no online permit search for this listing. Ask the office at 936-275-2762 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.

Can I check a contractor's license for work in San Augustine County?

Yes, at www2.tceq.texas.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the San Augustine County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. San Augustine County borders Angelina County, Jasper County, Nacogdoches County, Sabine County, Shelby County.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with San Augustine County.