County Permit SearchU.S. compliance directory
TexasMitchell County

Administrative overview · FIPS 48335

Mitchell County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

State Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked State Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Texas Commission on Environmental Quality Region 3 - Abilene OSSF Program

For a project in or near Mitchell County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

TCEQ Region 3 - Abilene: 325-698-9674; statewide OSSF questions: 512-239-3799; Mitchell County Judge: 325-728-8439

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

TCEQ Region 3, 1977 Industrial Boulevard, Abilene, TX 79602-7833; Mitchell County Courthouse, 349 Oak Street, Colorado City, TX 79512

Operating hours

TCEQ: Monday-Friday, 8:00 AM-5:00 PM except state holidays; Mitchell County permit-office hours: N/A

Review expectation

The permitting authority must approve or deny a complete OSSF application and planning materials within 30 days of receipt and provide a written explanation for a denial. No general structural-permit timeline was found.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Mitchell County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact TCEQ Region 3 - Abilene: 325-698-9674; statewide OSSF questions: 512-239-3799; Mitchell County Judge: 325-728-8439.

How long might review take?

The permitting authority must approve or deny a complete OSSF application and planning materials within 30 days of receipt and provide a written explanation for a denial. No general structural-permit timeline was found.

How are inspections scheduled?

Submit TCEQ Form 0235, proof of the legal description, soil/site evaluation, planning materials, and applicable fee to the Region 3 OSSF Program. Do not begin construction until TCEQ issues authorization to construct; coordinate the required installation inspection with Region 3 at 325-698-9674 and leave components available for inspection. The state application authorizes TCEQ entry for site evaluation and investigation.

Which codes and exemptions should I review?

For unincorporated Mitchell County, the verified permit authority is the TCEQ Region 3 OSSF Program under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. The county's official website does not publish a county building department, structural building-code edition, general development permit, or county floodplain program for 2026; incorporated places may impose municipal building codes. Under state OSSF rules, the conditional 10-acre exemption may apply only to one single-family dwelling on a tract of at least ten acres after a licensed site evaluator or engineer evaluates it, when every system component is at least 100 feet from the property line, all effluent remains on the tract, and the system creates no nuisance or groundwater pollution. Listed emergency repairs may proceed without a prior permit but must be reported in writing within 72 hours. Grandfathering is limited to qualifying older, unaltered, non-nuisance systems. No county minor structural-work exemption was published.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?