County Permit SearchU.S. compliance directory
TexasLlano County

Administrative overview · FIPS 48299

Llano County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Llano County Development Services and 9-1-1 Addressing

For a project in or near Llano County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

325-247-2039; fax 325-247-3785

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

100 W. Sandstone Street, Suite 200A, Llano, TX 78643

Operating hours

Operating hours not verified

Review expectation

Allow 7-10 business days for non-floodplain determinations; floodplain development, septic permits, and commercial projects may take longer. A floodplain development permit expires 180 days after issuance and may receive one additional 180-day extension for good cause if requested before expiration; no further extension is allowed.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Llano County

Who handles permitting for this jurisdiction?

Llano County Development Services and 9-1-1 Addressing is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 325-247-2039; fax 325-247-3785.

How long might review take?

Allow 7-10 business days for non-floodplain determinations; floodplain development, septic permits, and commercial projects may take longer. A floodplain development permit expires 180 days after issuance and may receive one additional 180-day extension for good cause if requested before expiration; no further extension is allowed.

How are inspections scheduled?

Apply through iWorQ and upload the site plan, scope, ownership and authorization documents, 9-1-1/address details, septic information, and any required elevation certificate, engineered plans, no-rise certificate, or floodproofing documents. Call 325-247-2039 to coordinate inspections. New or substantially improved development below BFE requires preliminary and final floodplain inspections; passing final inspection and submission of the final elevation certificate and owner confirmation are prerequisites to a Certificate of Compliance. OSSF construction must await authorization and every system is county-inspected before approval to operate.

Which codes and exemptions should I review?

Llano County reviews development in unincorporated areas under its Development Services orders, 2025 Subdivision Regulations, 2021 Flood Damage Prevention Order/NFIP standards, 9-1-1 addressing order, road-cut rules, and OSSF order. Any development in a special flood hazard area requires a floodplain development permit; floodplain construction must meet elevation, anchoring, flood-opening, no-rise, and engineering requirements. The county adopts 30 TAC Chapters 30 and 285 for OSSF and permits and inspects every on-site system regardless of tract size. No general countywide ICC structural building-code edition was found. All proposed structures or development projects enter the county development-review process, although the additional floodplain permit applies when development is in a special flood hazard area. Llano County expressly permits and inspects every OSSF regardless of tract size, so the state 10-acre permit exception does not apply. No cosmetic-work exemption list is published; the application identifies clearing, fill, grading, excavation, docks, retaining walls, fences, drainage work, roof replacement, demolition/rebuild, and other development for county review.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?