County Permit SearchU.S. compliance directory
TexasHouston County

Administrative overview · FIPS 48225

Houston County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Houston County Floodplain Administrator / TCEQ Region 10 Beaumont OSSF Program

For a project in or near Houston County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Houston County Judge/Floodplain Administrator Jim Lovell: 936-544-3255 ext. 221; TCEQ Region 10 Beaumont: 409-898-3838

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Houston County Judge, 401 East Goliad Avenue, Suite 201, Crockett, TX 75835; TCEQ Region 10, 3870 Eastex Freeway, Beaumont, TX 77703-1830

Operating hours

TCEQ Region 10: Monday-Friday, 8:00 a.m.-5:00 p.m.; Houston County Judge office hours: N/A

Review expectation

TCEQ must approve or deny a complete OSSF permit application and planning materials within 30 days. Houston County does not publish a typical floodplain or subdivision review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Houston County

Who handles permitting for this jurisdiction?

Houston County Floodplain Administrator / TCEQ Region 10 Beaumont OSSF Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Houston County Judge/Floodplain Administrator Jim Lovell: 936-544-3255 ext. 221; TCEQ Region 10 Beaumont: 409-898-3838 and request the current application route before preparing a final submittal.

How long might review take?

TCEQ must approve or deny a complete OSSF permit application and planning materials within 30 days. Houston County does not publish a typical floodplain or subdivision review timeline.

How are inspections scheduled?

Contact County Judge/Floodplain Administrator Jim Lovell at 936-544-3255 ext. 221 before development in a mapped flood-hazard area. For an OSSF where TCEQ is the permitting authority, submit the state application, planning materials, and fee to Region 10; arrange the required site evaluation and design through appropriately licensed personnel, and coordinate construction and final inspections with Region 10 at 409-898-3838 before covering or operating the system.

Which codes and exemptions should I review?

Houston County's County Judge is the listed county Floodplain Administrator, and the county publishes subdivision regulations for unincorporated development. The official materials reviewed do not publish a general county building-permit program or an adopted countywide ICC structural-code edition. Where TCEQ is the OSSF permitting authority, systems are governed by Texas Health and Safety Code Chapter 366 and current 30 TAC Chapter 285 through TCEQ Region 10 Beaumont. Houston County does not publish a general cosmetic-work exemption list or a countywide ordinary-building permit program. State OSSF rules provide a narrow 10-acre single-family exemption when all statutory conditions are met, preserve qualifying grandfathered systems that are not altered and do not threaten health or safety, and allow defined emergency repairs when reported in writing to the permitting authority within 72 hours; other construction, alteration, repair, extension, or operation requires authorization.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?