County Permit SearchU.S. compliance directory
TexasHardin County

Administrative overview · FIPS 48199

Hardin County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Hardin County Floodplain Administration / Permit Office

For a project in or near Hardin County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Floodplain/Permit Office: 409-246-5250 or 409-246-5251; county main: 409-246-5200

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Hardin County Floodplain Office, 225 Crocker Street, Kountze, TX 77625; Hardin County Courthouse, 300 W. Monroe Street, Kountze, TX 77625

Operating hours

Operating hours not verified

Review expectation

N/A; the county publishes permit forms and fees but no standard review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Hardin County

Who handles permitting for this jurisdiction?

Hardin County Floodplain Administration / Permit Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Floodplain/Permit Office: 409-246-5250 or 409-246-5251; county main: 409-246-5200 and request the current application route before preparing a final submittal.

How long might review take?

N/A; the county publishes permit forms and fees but no standard review timeline.

How are inspections scheduled?

Submit the appropriate county permit application to the Floodplain Office. Residential development, electrical, manufactured-home, subdivision, commercial/industrial, culvert, solar, and tower/pipeline applications have separate forms or fee procedures. No work may begin until a permit is issued; the applicant consents to reasonable compliance inspections. For OSSF/septic work, use the current TCEQ application and confirm Region 10 submission and inspection requirements.

Which codes and exemptions should I review?

Hardin County’s published permit program is administered by Floodplain Administration and covers electrical service, manufactured-home placement, residential/commercial/industrial development, subdivisions, culverts, solar installations, towers, and pipelines. Permit requests in Special Flood Hazard Areas must comply with the Hardin County Floodplain Ordinance. No countywide ICC building-code edition was verified. TCEQ Region 10 is the state OSSF permitting authority identified for Hardin County in the state program materials. Hardin County requires a permit before development, broadly defined to include buildings, grading, paving, excavation, drilling, storage, and other man-made changes. The county states that fees may be waived for non-residential outbuildings and some other development depending on intended use, but this is discretionary and not a permit exemption. The first roadside culvert installation is listed with no county installation charge, although a $50 permit applies to subsequent culverts. Septic exemptions must be checked with TCEQ Region 10.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?