Culberson County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

State Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked State Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Texas Commission on Environmental Quality (TCEQ) Region 6 OSSF Program; Culberson County County Judge

For a project in or near Culberson County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

TCEQ Region 6: 915-834-4949; TCEQ OSSF Program: 512-239-3799; Culberson County Judge: 432-283-2059

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

TCEQ Region 6, 401 E Franklin Ave, Suite 560, El Paso, TX 79901-1212; Culberson County Courthouse, 300 La Caverna Street, Van Horn, TX 79855

Operating hours

TCEQ OSSF Program: Monday-Friday 8:00 a.m.-5:00 p.m.; Culberson County office hours N/A

Review expectation

TCEQ requires the permitting authority to approve or deny complete OSSF planning materials and the permit application within 30 days of receipt.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Culberson County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact TCEQ Region 6: 915-834-4949; TCEQ OSSF Program: 512-239-3799; Culberson County Judge: 432-283-2059 and request the current application route before preparing a final submittal.

How long might review take?

TCEQ requires the permitting authority to approve or deny complete OSSF planning materials and the permit application within 30 days of receipt.

How are inspections scheduled?

Submit the TCEQ-0235 application and required site evaluation/planning materials to TCEQ Region 6 OSSF Program; do not begin construction before Authorization to Construct. Contact Region 6 at 915-834-4949 or the TCEQ OSSF Program at 512-239-3799 for inspection and submission instructions.

Which codes and exemptions should I review?

No countywide building-code edition or general county building-permit program was verified. State fallback OSSF requirements are Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285; the current TCEQ-0235 application is revised February 2026. An OSSF may qualify under the Texas 10-acre rule only if all state conditions are met: a licensed site evaluation or PE report, single-family dwelling on at least 10 acres, no nuisance or groundwater pollution, all system parts at least 100 feet from property lines, on-site effluent disposal, and only one dwelling on the tract. Grandfathered systems and defined emergency repairs may also be exempt, subject to state conditions and notice requirements.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?