Washington County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Washington County Zoning, Planning & Building Codes Office

For a project in or near Washington County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

423-753-1753 (Zoning & Planning); 423-753-2062 (Chief Building Official Scott Chapman); 423-753-1852 (Planning Director Angie Charles); 423-753-1714 (Highway driveway permits)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Washington County Zoning & Planning, 100 E. Main Street, Suite 103, Jonesborough, TN 37659; mailing address P.O. Box 417, Jonesborough, TN 37659

Operating hours

Monday-Friday, 8:00 a.m.-4:00 p.m.

Review expectation

Next-day inspection service is available for requests made before 3:00 p.m. the prior day; the county does not publish a general plan-review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Washington County

Who handles permitting for this jurisdiction?

Washington County Zoning, Planning & Building Codes Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 423-753-1753 (Zoning & Planning); 423-753-2062 (Chief Building Official Scott Chapman); 423-753-1852 (Planning Director Angie Charles); 423-753-1714 (Highway driveway permits).

How long might review take?

Next-day inspection service is available for requests made before 3:00 p.m. the prior day; the county does not publish a general plan-review timeline.

How are inspections scheduled?

Submit the application and required septic and driveway documentation; typical new residential construction does not require plans according to the county FAQ. All inspections must be scheduled by 3:00 p.m. the prior day by calling 423-753-1753; the county addendum says next-day site service is available when requested before 3:00 p.m. The applicant must call for required inspections and final approval, and permits become invalid if work does not start or inspections are not requested for 180 days.

Which codes and exemptions should I review?

Washington County adopted the 2018 International Residential Code for residential dwellings. The county zoning office also administers stormwater, floodplain, zoning, planning, and other building-code requirements; its public page does not identify a separate current commercial code edition. Permits are required for constructing buildings or structures, pools, decks, additions, renovations, manufactured housing, and grading. The county’s published materials do not list a broad cosmetic-repair exemption. Accessory structures and decks under 200 square feet use a residential zoning-compliance permit and fee rather than the full building-permit fee schedule; confirm whether a particular minor repair is exempt before work begins. Fencing is not regulated by Zoning & Building Codes according to the county FAQ.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?