County Permit SearchU.S. compliance directory
South CarolinaUnion County

Administrative overview · FIPS 45087

Union County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Union County Department of Building Safety & Floodplain Management

For a project in or near Union County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

864-424-2341

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Union County Department of Building Safety, 1246 S. Duncan Bypass, Suite B, Union, SC 29379

Operating hours

Permitting and inspections: Monday-Friday, 9:00 AM-4:00 PM; general county offices 9:00 AM-5:00 PM excluding holidays

Review expectation

N/A; the county publishes required plan and septic documentation but no standard permit-review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Union County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 864-424-2341.

How long might review take?

N/A; the county publishes required plan and septic documentation but no standard permit-review timeline.

How are inspections scheduled?

A 24-hour notice is required for all inspections; contact the Building Safety office at 864-424-2341. Post and protect the permit and address at the site. Required residential stages include footing, foundation, under-slab plumbing, slab, rough plumbing/electrical/mechanical, fireplace where applicable, framing, insulation, power/meter release, final trade inspections and final building. A certificate of occupancy is issued after final building approval.

Which codes and exemptions should I review?

Union County and its municipal partners adopt the latest International Building Codes; the county's 2024 hazard-mitigation plan identifies the 2021 code adoption context. The applicable 2026 South Carolina cycle is the 2021 International Building, Residential, Fire, Plumbing, Mechanical and Fuel Gas Codes with South Carolina modifications, 2020 NEC and applicable state energy/accessibility requirements. The county lists retaining walls no higher than 4 feet; sidewalks and driveways no more than 30 inches above grade; painting, papering, tiling, carpeting, cabinets, countertops and similar finish work; qualifying above-ground pools less than 24 inches deep and not over 5,000 gallons; fences; minor electrical repairs such as replacing lamps or defective receptacles; portable heating appliances or replacement parts that do not alter equipment approval; and plumbing repairs such as leaks, drain/waste/vent repairs and stoppage clearing.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?