Who issues permits
New York City Department of Buildings is the county office listed for building permits in Richmond County.
Also listed: Staten Island Borough Office.
How to get a permit in Richmond County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the portal at nyc.gov, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Richmond County permit records
The listing’s online portal is at nyc.gov ↗. Look for its public search and try the property address, parcel number or permit number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask New York City Department of Buildings at 718-420-5400. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
New York City Department of Buildings publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
NYC DOB administers the current 2022 NYC Construction Codes and applicable 2025 NYC Energy Conservation Code provisions. The 2026 NYC Construction Codes were adopted but are scheduled to become effective July 17, 2027, so the 2022 codes remain the principal construction standard in 2026.
New York: statewide code. Details
Work that may not need a permit
Most construction requires a DOB permit. Limited exemptions may include ordinary cosmetic work that does not affect structure, egress, fire safety, plumbing, electrical, mechanical, occupancy, or zoning; confirm the exact work through DOB permit guidance before starting.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Submit applicable filings through DOB NOW: Build or the legacy eFiling/BIS system. Schedule construction development, enforcement, electrical, and plumbing inspections through DOB NOW: Inspections or the designated Staten Island unit. Staten Island contacts include Construction Development 718-420-5418, Construction Enforcement 718-420-3590, Electrical Development 718-420-5411, and Plumbing Development 718-420-5416.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
NYC DOB may issue violations and civil penalties, impose a Stop Work Order, reject or revoke filings, require legalization or correction, and refer matters for further enforcement. Work requiring a permit must not proceed until DOB issues it; work-without-a-permit penalties are payable through the applicable borough process.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at 718-420-5400 about:
- Review times: how long plan review currently takes. Review time depends on filing type, objections, professional certification, and project scope.
New York rules that apply in Richmond County
These rules come from New York law and state agencies, so they apply in Richmond County on top of anything the local office requires.
Building code
Statewide code
The 2025 Uniform Code (19 NYCRR Parts 1219 to 1229) and the 2025 Energy Conservation Construction Code (19 NYCRR Part 1240) apply everywhere in the state except New York City. The Code Council adopted both on July 25, 2025, and both took effect December 31, 2025.
Read more
They replace the 2020 editions. Before that date, applicants could follow either the 2020 or the 2025 Uniform Code, but the Department of State says the Energy Code had no transition period. The state code books, including the 2025 Residential Code of New York State for one- and two-family homes and townhouses, are based on the 2024 International Code Council codes with New York changes, and the ICC posts them free to read online. NYC's Department of Buildings describes the state energy code as based on the 2024 IECC. The 2025 rules also contain a ban on fossil-fuel equipment in most new buildings (Subpart 1229-2 and Section 1240.6), which comes from the All-Electric Buildings Act. As of the Department of State's July 2, 2026 update, that ban was suspended by court order and was neither effective nor enforceable. New York City has its own codes: the 2022 NYC Construction Codes, the 2025 NYC Electrical Code (NYC amendments to the 2020 NEC, in full effect since December 21, 2025), and the 2025 NYC Energy Conservation Code, which applies to applications filed on or after March 30, 2026.
Outside city limits
New York has no unincorporated land in the usual sense. Every address outside a city is in a town, and some are also inside a village. Executive Law § 381 makes the local government, meaning a city, a village, or a town for the area outside any village, responsible for enforcing the Uniform Code.
Read more
A city, town or village can opt out by local law, and enforcement then passes to the county. If that county has opted out too, the Department of State enforces the code there. The code applies everywhere in all of these cases. Only who issues the permit changes. To find out who handles your address, start with your town, city or village hall.
Contractor and trade licensing
New York State does not license general contractors or home improvement contractors. The Department of State says New York City, Buffalo, and the counties of Suffolk, Nassau, Westchester, Putnam and Rockland require home improvement contractors to be licensed, and some other towns and villages have their own rules.
Read more
In NYC, the Department of Consumer and Worker Protection (DCWP) licenses home improvement contractors, and you can check a license on its Search Business tool. Elsewhere, check with the county or town that issues the license. Statewide, the Department of State advises getting a written contract with the work description, timeline, price and payment schedule, and it notes that you have three days to cancel a home improvement contract in writing after signing. The state has no owner-builder rule. Whether a homeowner can pull their own permit and do the work is decided by the local building department and the local licensing law. In NYC, electrical work must be done by a city-licensed electrician, plumbing by a licensed plumber, and larger alterations need plans filed by a registered architect or professional engineer.
Electrical, plumbing and HVAC
New York has no statewide electrician or plumber license. These trades are licensed by local governments where those governments choose to. New York City's Department of Buildings licenses master plumbers and electricians, and in NYC electrical work needs a separate electrical permit and a city-licensed electrician.
Read more
Suffolk County Consumer Affairs licenses master electricians and restricted electricians, and other counties and towns run their own boards. The one related state credential is the Department of State's security and fire alarm installer license. Locally licensed master electricians who work outside their home area on those systems may need it. Electrical and plumbing work outside NYC must still meet the Uniform Code, and the local building department decides how that work is permitted and inspected.
State programs that can affect your permit
All-Electric Buildings Act (fossil-fuel ban in new buildings)
The 2025 Uniform Code and Energy Code include rules that ban fossil-fuel heating, hot water and cooking equipment in most new buildings. The ban applies to buildings of seven stories or fewer whose permit application is filed on or after December 31, 2025, and to all buildings filed after December 31, 2028, with exemptions such as manufactured homes, agricultural buildings and emergency backup power. Existing buildings are not covered. The state agreed to suspend the ban while a court challenge was pending. On June 30, 2026, the Second Circuit held that the law is not preempted by federal law, but the Department of State's July 2, 2026 update says the ban is still suspended by court order and is not in force. Before you design a new home, check the Department of State's notice page for the current status.
Manufactured Homes Certification Program
The Department of State certifies manufactured home manufacturers, retailers, installers and mechanics. Homes must be installed under the Uniform Code, and since December 31, 2025, local work such as porches, decks and additions has to follow the 2025 Residential Code of New York State. The state keeps a list of certified installers, and it hears complaints about defects in delivery, installation or service if they are filed within one year and ten days.
Uniform Code variances and appeals (regional Boards of Review)
If you need relief from a Uniform Code requirement, or want to appeal a code official's decision, the case goes to the Department of State under 19 NYCRR Part 1205, not to the town. Regional Boards of Review sit in Albany, Buffalo, the Hudson Valley, Long Island, Rochester and Syracuse. Contact your regional office before applying. A hearing can take one to three months or longer to schedule.
Verified October 28, 2026 against New York sources. New York permit rules, sources and other counties
Common projects in Richmond County
New York has statewide rules on file for 1 of these projects; they apply in Richmond County along with local permit requirements.
Sheds and accessory buildings
Under 19 NYCRR Part 1203, a local code program may choose to exempt from building permits one-story detached sheds, playhouses and similar structures of up to 144 square feet that go with one- or two-family homes or townhouses. The exemption applies only where the local program says so, and the structure must still meet the code.
New York source: dos.ny.gov ↗ · Sheds and accessory buildings permit guide
Named in Richmond County’s exemption summary (read it before assuming the work is exempt): Heating and air conditioning · Electrical work · Plumbing work
Guides for other projects: Decks · Fences · Roof replacement · Water heaters · Rooftop solar · Pools and spas · Accessory dwelling units · Demolition · All 21 project guides
Other permits you may need in Richmond County
These are separate from the building permit and come from the agencies named, under New York rules.
Septic system
Local health department (NYSDOH standards)
Septic systems for homes with flows under 1,000 gallons per day must meet the State Health Department's standards in 10 NYCRR Appendix 75-A, applied by the local health department (a city or county health department or a State Health Department district office), which may adopt stricter standards.
Read more
Plans must be prepared by or under the supervision of a New York licensed or registered design professional (10 NYCRR 75.5), and the site evaluation includes at least one test hole at least six feet deep and at least two percolation tests. Systems in the New York City water supply watershed also need New York City DEP approval.
Floodplain development
NYSDEC
The Department of Environmental Conservation is New York's NFIP coordinating agency, and each participating community has a designated floodplain administrator, often the building inspector or code enforcement officer.
Read more
Any development in a FEMA Special Flood Hazard Area requires a local floodplain development permit, and DEC states that since 2007 the lowest floor in A zones must be at or above the base flood elevation plus two feet.
Official page: dec.ny.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
NYSDOT
If your home is on a state highway, you need a highway work permit from the NYS Department of Transportation to build or modify a driveway. The property owner or contractor applies online through NYSDOT's PermiTrack system, and homeowners doing their own work are exempt from the insurance requirement.
Erosion and sediment control
NYSDEC
Construction that disturbs one or more acres of soil needs coverage under DEC's SPDES General Permit for Stormwater Discharges from Construction Activity (GP-0-25-001, effective January 29, 2025), filed as an electronic Notice of Intent with a Stormwater Pollution Prevention Plan.
Read more
Lower thresholds apply in the New York City East of Hudson watershed (5,000 square feet) and within New York City (20,000 square feet), and projects inside a regulated MS4 municipality need the municipality's SWPPP acceptance.
Water well
NYSDEC
Water well drilling businesses must register annually with DEC, notify DEC before drilling a water well, and file a Water Well Completion Report with DEC when the well is finished, with a copy to the owner.
Read more
Wells are built to the State Health Department's Appendix 5-B standards, and some counties have their own approval requirements for new wells.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Richmond County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 718-420-5400 if you are unsure.
Can I apply for a permit online in Richmond County?
Yes. The listing includes an online permit portal at nyc.gov. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Richmond County?
New York City Department of Buildings publishes its fee schedule online (nyc.gov). Look up your project type there, and ask the office at 718-420-5400 for an estimate if your project is not listed.
How do I look up past permits for an address in Richmond County?
Start with the portal at nyc.gov and search by address, parcel or permit number. If an older permit is not there, ask the office at 718-420-5400 for the file or send a public records request.
Can I check a contractor's license for work in Richmond County?
Yes, at nyc.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Richmond County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Richmond County borders Kings County, Queens County, Hudson County (New Jersey), Middlesex County (New Jersey), Monmouth County (New Jersey), Union County (New Jersey).