County Permit SearchU.S. compliance directory
MississippiStone County

Administrative overview · FIPS 28131

Stone County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Stone County Planning & Building Department

For a project in or near Stone County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

601-928-2810

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

311 Court Street, Suite C, Wiggins, MS 39577

Operating hours

Monday-Friday, 8:00 AM-5:00 PM; closed 12:00 PM-1:00 PM for lunch

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Stone County

Who handles permitting for this jurisdiction?

Stone County Planning & Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 601-928-2810.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Submit the permit application to Planning & Building and coordinate inspections with the office at 601-928-2810 or build@stonecountyms.gov. The county's solar procedure says to notify the office when power-disconnection work is scheduled so staff can stand by to inspect; the fee schedule lists reinspection and after-the-fact inspection fees.

Which codes and exemptions should I review?

Stone County's current Planning & Building materials identify the 2003 International Building Code and 2003 International Residential Code as the county's enforced building and residential codes. A January 2025 county notice specifically confirms use of the 2003 IRC. The county states that structures over 200 square feet require permits, so structures at or below 200 square feet are the published size-based exception. No broader minor/cosmetic exemption list is published; floodplain, mobile-home, electrical, plumbing, mechanical, and other work may require separate permits.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?