County Permit SearchU.S. compliance directory
MississippiPearl River County

Administrative overview · FIPS 28109

Pearl River County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Pearl River County Planning & Building Department

For a project in or near Pearl River County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

601-403-2202 (Poplarville); 601-749-7731 (Picayune)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

100 S Main Street, Poplarville, MS 39470; 917 Goodyear Boulevard, Picayune, MS 39466

Operating hours

Monday-Friday, 8:00 AM-5:00 PM; closed daily noon-1:00 PM

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Pearl River County

Who handles permitting for this jurisdiction?

Pearl River County Planning & Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 601-403-2202 (Poplarville); 601-749-7731 (Picayune).

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Apply and request inspections through Pearl River County's MGO Connect portal at https://www.mgoconnect.org/. For assistance, contact Planning & Building at 601-403-2202 or 601-749-7731; MGO help desk: 985-851-0760.

Which codes and exemptions should I review?

2018 International Building and Residential Codes, administered through the county's adopted 2018 Family of International Building Codes ordinance; floodplain and county development ordinances also apply. N/A—no general minor/cosmetic exemption list was published. The department provides separate checklists for mobile homes, residential-commercial work, tiny houses, and utility buildings/additions/remodeling; flood-hazard-area work requires an elevation certificate.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?