County Permit SearchU.S. compliance directory
LouisianaWashington Parish

Administrative overview · FIPS 22117

Washington Parish County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Washington Parish Government Building and Permitting Department

For a project in or near Washington Parish, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(985) 839-5456

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

203 11th Avenue, Franklinton, LA 70438

Operating hours

Operating hours not verified

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Washington Parish

Who handles permitting for this jurisdiction?

Washington Parish Government Building and Permitting Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (985) 839-5456.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

The building official performs inspections after notification by the permit holder or agent. Residential stages include flood-elevation/story-pole, temporary pole, pre-pour plumbing, footings/foundation, brick, rough-in mechanical/electrical/plumbing/framing, insulation, final, and final-grade inspections. Approved plans must generally be present at the job site; call the Department at 985-839-5456 for scheduling.

Which codes and exemptions should I review?

Washington Parish materials reference the 2021 International Residential Code and 2021 International Energy Conservation Code, together with Act 12/local permitting and flood-damage-prevention requirements; the parish also applies the Louisiana State Uniform Construction Code and applicable 2020 National Electrical Code provisions. The fee schedule exempts agricultural structures when supported by IRS Schedule F or an affidavit. Noncommercial small jobs of 200 square feet or less, including fences 7 feet or less, painting, wallpapering, tiling, carpeting, countertops, and playground equipment, are listed as fee-exempt. Pond digging for agricultural use or NRCS projects is also fee-exempt; these are fee exemptions and do not necessarily eliminate other approvals.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?