County Permit SearchU.S. compliance directory
LouisianaTangipahoa Parish

Administrative overview · FIPS 22105

Tangipahoa Parish County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Tangipahoa Parish Government Permit Office

For a project in or near Tangipahoa Parish, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(985) 542-2117 Hammond; (985) 748-2024 Amite

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

15485 West Club Deluxe Road, Hammond, LA 70403; 113 North Bay Street, Amite, LA 70422

Operating hours

Operating hours not verified

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Tangipahoa Parish

Who handles permitting for this jurisdiction?

Tangipahoa Parish Government Permit Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (985) 542-2117 Hammond; (985) 748-2024 Amite.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

The application requires inspection requests at least 24 hours in advance, with inspected items ready by 8:00 a.m. on the inspection day. Use the parish inspection schedule PDF for phase/final sequence; online users can request inspections in MyGovernmentOnline. Contact Hammond 985-542-2117 or Amite 985-748-2024.

Which codes and exemptions should I review?

2021 International Building, Residential, Plumbing, Mechanical, Fuel Gas, Energy, and Property Maintenance Codes, plus 2020 National Electrical Code, as adopted/enforced through the Louisiana State Uniform Construction Code Council and parish requirements. N/A. The official page requires permits before any structure is built and requires electrical, mechanical, and plumbing subcontractor permits; it does not publish a general minor or cosmetic exemption list. A notarized homeowner affidavit is required when acting as the homeowner contractor.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?