County Permit SearchU.S. compliance directory
MinnesotaTodd County

Administrative overview · FIPS 27153

Todd County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Todd County Planning & Zoning Office

For a project in or near Todd County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

320-732-4420

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

215 1st Avenue South, Suite 103, Long Prairie, MN 56347 (the department page also lists Suite 300 as its general office address); Staples branch: 200 1st Street NE, Suite 1, Staples, MN 56479

Operating hours

Monday-Friday, 8:00 AM-4:30 PM

Review expectation

Most land-use permit applications are reviewed and acted upon within 10 business days. Conditional-use, variance, subdivision and similar applications may require public-hearing schedules.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Todd County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 320-732-4420.

How long might review take?

Most land-use permit applications are reviewed and acted upon within 10 business days. Conditional-use, variance, subdivision and similar applications may require public-hearing schedules.

How are inspections scheduled?

Call Todd County Planning & Zoning at 320-732-4420. The county's permit terms direct applicants to call that number to schedule septic/SSTS inspections; electrical inspections are arranged with the Minnesota electrical inspector at 320-760-1017. Permit changes must be made before land use begins.

Which codes and exemptions should I review?

Todd County states that it does not adopt or enforce the Minnesota State Building Code. The Planning & Zoning Office administers county land-use ordinances covering zoning, septic systems, feedlots, subdivisions, shoreland, gravel pits/mining and floodplain management; applicable building-code enforcement must be confirmed with the municipality or state authority. The 2026 county schedule states that non-structural normal maintenance such as shingles, doors, windows and siding does not require a permit. Structural alterations affecting roof rafters, foundations, outside walls or other supporting elements do require a permit. Other exemptions should be confirmed with Planning & Zoning.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?