Who issues permits

Marshall County Water and Land Office is the county office listed for building permits in Marshall County.

Also listed: Environmental Services.

How to get a permit in Marshall County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Request the application from the office at 218-745-4217; no form or portal is published online.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  5. Get the final approval and keep it with the approved plans and receipts.

Search Marshall County permit records

No online permit portal is listed, so permit history is kept by Marshall County Water and Land Office. Call 218-745-4217 or visit Marshall County Water and Land Office, 208 E. Colvin Avenue, Suite 3, Warren, MN 56762 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Building codes and exemptions

Codes referenced

Marshall County administers zoning, shoreland, floodplain, land-alteration, and subsurface sewage treatment requirements in unincorporated areas. Applicable Minnesota State Building Code requirements and state electrical, plumbing, septic, floodplain, and environmental regulations also apply. The county sources reviewed do not publish a separate current 2026 county building-code edition.

Minnesota: partial statewide code. Details

Work that may not need a permit

The county shoreland ordinance requires permits for buildings and additions, decks and signs, sewage-treatment systems, and non-exempt grading or filling. Grading or filling necessary for structures, sewage systems, or driveways covered by a valid construction permit does not require a separate grading/filling permit. Vegetation alteration necessary for permitted structures, sewage systems, roads, or parking areas is exempt from the ordinance's additional vegetation-alteration standards; removal of dead, diseased, or hazardous trees is also excluded from those standards. Confirm any minor interior or cosmetic work with the county before starting.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Submit permit materials to the Zoning or Shoreland Administrator on county forms with a site plan, proposed structures, relevant natural features, and copies of required municipal, state, or federal approvals. The county issues a certificate of zoning compliance for permitted activities. Contact 218-745-4217 or 218-745-5841 to arrange project review or inspections; no online inspection scheduler or advance-notice interval was published.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

The Marshall County Shoreland Ordinance treats violations and failure to comply with its requirements as misdemeanors punishable as provided by law, regardless of whether a permit was required for the activity. The county may take other lawful action to prevent or remedy violations; the reviewed county sources do not publish a current after-the-fact fee multiplier or fixed dollar fine.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 218-745-4217 about:

  • Fees: the current fee schedule and an estimate for your project.
  • Review times: how long plan review currently takes.

Minnesota rules that apply in Marshall County

These rules come from Minnesota law and state agencies, so they apply in Marshall County on top of anything the local office requires.

Building code

Partial statewide code

Under Minnesota Statutes 326B.121, the State Building Code applies statewide and overrides any local building code. Local enforcement is a separate question. A municipality that had adopted the code by January 1, 2008 must keep enforcing it and cannot repeal its ordinance.

Read more

That rule does not bind municipalities under 2,500 people outside a metropolitan county. Other municipalities may choose to adopt and enforce the code, and agricultural buildings are largely exempt. For homes, the current code is the 2020 Minnesota Residential Code (Minnesota Rules chapter 1309), which amends the 2018 International Residential Code. It is part of the 2020 State Building Code, which took effect March 31, 2020. Minnesota replaces the IRC's energy, mechanical, plumbing and electrical chapters with its own codes. These include the 2020 Minnesota Residential Energy Code, the 2020 Minnesota Mechanical and Fuel Gas Code, the 2020 Minnesota Plumbing Code (based on the IAPMO plumbing code) and the Minnesota Electrical Code. Electrical work follows the 2026 National Electrical Code for permits filed on or after August 17, 2026. Permits filed before that date follow the 2023 NEC. An update is underway. On February 2, 2026, DLI published requests for comments on rules that would adopt the 2024 IRC, including its energy chapter, with Minnesota amendments. As of October 2026, DLI's rulemaking dockets list the proposed rules, hearing and effective date as "to be determined," so the 2018-based code is still in force.

Minnesota Department of Labor and Industry, Construction Codes and Licensing Division ↗

Outside city limits

Minnesota has no single rule for who issues building permits outside cities. It depends on whether your city, township or county has adopted the State Building Code. DLI's overview says the code cannot be enforced by a municipality unless it is adopted by local ordinance, so in townships and counties that have not adopted it there may be no building permit or building inspection for a house.

Read more

The code still sets the legal standard there. A city may, with the township board's permission, extend its code enforcement up to two miles into unincorporated territory next to it. Zoning, septic and other local permits can still apply where there is no building code enforcement. Electrical permits are required statewide: where no local electrical inspection ordinance exists, you file with DLI and a state inspector inspects. In areas with no local inspection department, DLI also handles plumbing inspections. Use DLI's Local Code Lookup to see who enforces the code where you live.

Contractor and trade licensing

DLI licenses residential building contractors, residential remodelers and residential roofers. A license is required to contract directly with the owner of a one- to four-unit home for work in more than one of eight "special skills": excavation, masonry and concrete, carpentry, interior finishing, exterior finishing, drywall and plaster, roofing, and general installation specialties.

Read more

A remodeler works only on existing structures, while a building contractor can also build new ones. Contractors who offer only one special skill generally do not need the license, but roofers do. Contractors whose gross annual receipts from licensed residential work stay under $15,000 can get a certificate of exemption instead (Minnesota Statutes 326B.805). Since July 1, 2023, companies that install solar panels on homes must hold a building contractor or remodeler license. Homeowners do not need a contractor license to build or improve a home they live in, will live in, or will keep as a rental. That exemption does not cover building for resale or speculation, and an owner who builds or improves more than one property within 24 months is presumed to be speculating unless the properties will be kept as rentals. Whether a homeowner can pull the building permit is up to the local building department.

Electrical, plumbing and HVAC

DLI licenses electricians and electrical contractors, and plumbers and plumbing contractors, statewide. Under Minnesota Statutes 326B.36, electrical installations are inspected by the state unless a local government has an electrical inspection ordinance.

Read more

DLI's directory shows for each city or township whether the authority having jurisdiction is the state or the local government. A homeowner does not need an electrical license to do electrical work personally on a home they own and live in, or will live in once it is built, if the home has its own electrical service not shared with another dwelling (326B.33, subdivision 21). A homeowner still needs a permit and inspection. Unlicensed people may also do plumbing on premises they own and actually occupy as a residence, if the work meets the plumbing code and no local ordinance forbids it (326B.46). DLI inspects plumbing in areas with no local inspection department or building official, and it inspects public buildings and state-licensed facilities in areas that have not adopted the State Building Code.

State programs that can affect your permit

State electrical permits and inspections

DLI inspects electrical work wherever a city or township has not adopted its own electrical inspection program. Before filing, check the authority having jurisdiction in DLI's electrical inspector directory. If it says "State," you file the permit with DLI, online through iMS or on paper. Homeowners use separate application forms for new homes and existing homes.

Official page: dli.mn.gov ↗

State plumbing inspections

DLI's regional plumbing standards representatives inspect projects in areas with no local inspection department or building official. They also inspect public buildings and state-licensed facilities in parts of the state where the code is not locally enforced, and some code-enforced areas.

Official page: dli.mn.gov ↗

Manufactured structures

DLI regulates the construction and installation of manufactured homes and prefabricated buildings and licenses manufactured home manufacturers, dealers and installers. It also reviews prefabricated building plans for compliance with the State Building Code, including building, plumbing, mechanical, electrical and energy.

Official page: dli.mn.gov ↗

Verified October 28, 2026 against Minnesota sources. Minnesota permit rules, sources and other counties

Common projects in Marshall County

Minnesota has statewide rules on file for 5 of these projects; they apply in Marshall County along with local permit requirements.

  • Decks

    Where the State Building Code is enforced, a deck or platform no more than 30 inches above grade does not need a building permit, as long as it is not attached to a structure with frost footings and is not part of an accessible route (Minnesota Rules 1300.0120).

    Also named in Marshall County’s exemption summary.

    Minnesota source: revisor.mn.gov ↗ · Decks permit guide

  • Fences

    Where the State Building Code is enforced, fences no taller than seven feet are exempt from a building permit (Minnesota Rules 1300.0120). Local zoning rules on height and placement still apply.

    Minnesota source: revisor.mn.gov ↗ · Fences permit guide

  • Sheds and accessory buildings

    Where the State Building Code is enforced, a one-story detached shed, playhouse or similar accessory building of 200 square feet or less does not need a building permit (Minnesota Rules 1300.0120). Electrical and plumbing permits may still be needed, and local zoning still applies.

    Minnesota source: revisor.mn.gov ↗ · Sheds and accessory buildings permit guide

  • Electrical work

    Electrical work needs a permit and inspection throughout Minnesota, from DLI or from a city with its own electrical inspection program. Permits filed on or after August 17, 2026 must meet the 2026 National Electrical Code.

    Minnesota source: dli.mn.gov ↗ · Electrical work permit guide

  • Rooftop solar

    Since July 1, 2023, companies that install solar panels on Minnesota homes must be licensed by DLI as a residential building contractor or remodeler. The electrical part of the installation must be done by a Minnesota-licensed electrical contractor.

    Minnesota source: dli.mn.gov ↗ · Rooftop solar permit guide

Named in Marshall County’s exemption summary (read it before assuming the work is exempt): Driveways and culverts

Guides for other projects: Roof replacement · Water heaters · Heating and air conditioning · Pools and spas · Accessory dwelling units · Demolition · Plumbing work · Septic systems · All 21 project guides

Other permits you may need in Marshall County

These are separate from the building permit and come from the agencies named, under Minnesota rules.

  • Septic system

    County SSTS programs (some cities and townships) under MPCA rules

    Counties, and some cities and townships, issue septic (SSTS) construction permits under MPCA rules (Minn. R. ch. 7080-7083). The application needs a site evaluation and design, normally by an MPCA-licensed SSTS professional, and the finished system gets a compliance inspection. Before signing a sale agreement, the seller must disclose the system in writing (Minn. Stat. 115.55, subd. 6).

    Official page: revisor.mn.gov ↗ · Septic permit guide

  • Floodplain development

    Minnesota DNR; city or county floodplain ordinance

    Cities and counties adopt and enforce floodplain ordinances, which the DNR must approve (Minn. Stat. 103F.121), and issue the local permits. State rules set the flood protection elevation at least 1 foot above the regional (100-year) flood and limit floodway encroachments to a 0.5-foot rise in flood stage (Minn. R. 6120.5700).

    Official page: revisor.mn.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Minnesota Department of Transportation (MnDOT)

    A driveway or other access onto a state trunk highway needs a MnDOT Access/Driveway Permit, and drainage changes in trunk highway right of way need a separate MnDOT Drainage Permit. Most permit applications can be submitted online through MnDOT's OLPA system.

    Official page: dot.state.mn.us ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Minnesota Pollution Control Agency (MPCA)

    Construction that disturbs one acre or more, or less than an acre if it is part of a larger common plan of development or sale, needs an NPDES/SDS construction stormwater permit from the MPCA (Minn. R. 7090.2010). The owner and operator must apply before land disturbance starts.

    Official page: revisor.mn.gov ↗

  • Water well

    Minnesota Department of Health (MDH)

    Wells must be built by an MDH-licensed well contractor, except that an individual may build a well on land they own or lease for their home or farm. Before drilling, the contractor or owner files a well notification with MDH and pays the fee, and the well must meet Minn. Stat. ch. 103I and Minn. R. ch. 4725.

    Official page: revisor.mn.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Marshall County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 218-745-4217 if you are unsure.

Can I apply for a permit online in Marshall County?

No online permit portal was found for this listing. Contact the office at 218-745-4217 to ask how applications are accepted.

How much does a building permit cost in Marshall County?

Marshall County Water and Land Office has no fee schedule online, so the cost has to come from the office. Call the office at 218-745-4217 with the project type, size and estimated value for a quote.

How do I look up past permits for an address in Marshall County?

There is no online permit search for this listing. Ask the office at 218-745-4217 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.

Can I check a contractor's license for work in Marshall County?

Yes, at secure.doli.state.mn.us. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Marshall County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Marshall County borders Beltrami County, Kittson County, Pennington County, Polk County, Roseau County, Grand Forks County (North Dakota), and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Marshall County.