County Permit SearchU.S. compliance directory
MinnesotaCarver County

Administrative overview · FIPS 27019

Carver County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Carver County Public Services Division, Land Management Department; Metro West Inspection Services for building inspections, with cities handling city-jurisdiction work

For a project in or near Carver County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Land Management: (952) 361-1820; Metro West building inspections: (763) 479-1720

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Carver County Land Management, 600 East 4th Street, Chaska, MN 55318

Operating hours

Monday-Friday, 8:00 a.m.-4:30 p.m.

Review expectation

N/A; no fixed county review timeline was published. Incomplete or unpaid applications can expire after 180 days, and the current application requires complete plans and supporting documents before review.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Carver County

Who handles permitting for this jurisdiction?

Carver County Public Services Division, Land Management Department; Metro West Inspection Services for building inspections, with cities handling city-jurisdiction work is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Land Management: (952) 361-1820; Metro West building inspections: (763) 479-1720.

How long might review take?

N/A; no fixed county review timeline was published. Incomplete or unpaid applications can expire after 180 days, and the current application requires complete plans and supporting documents before review.

How are inspections scheduled?

After application submittal, review, approval, and issuance are complete, schedule inspections with Metro West Inspection Services at (763) 479-1720. Inspections require at least 24 hours' advance notice and are scheduled Monday-Friday, 7:00 a.m.-4:30 p.m.; same-day service is not guaranteed. The applicant must keep approved plans and inspection records on site and ensure work is exposed and accessible.

Which codes and exemptions should I review?

Carver County administers zoning and building-code permits in the county's townships; construction in city jurisdictions is reviewed by the city. The current Minnesota framework is the 2020 Minnesota State Building Code and related 2020 Minnesota Residential, Mechanical and Fuel Gas, Plumbing, Accessibility, Existing Building, and other chapters, with the 2024 Minnesota Commercial Energy Code; electrical permits filed before August 17, 2026 follow the 2023 NEC, with the 2026 NEC scheduled to take effect August 17, 2026. The county's current application requires an energy-code compliance certificate and routes inspections to Metro West Inspection Services. Building permits are required for structures over 200 square feet and for new construction, additions, driveways, work to existing structures, and regulated electrical, gas, plumbing, or mechanical work. Structures 200 square feet or less do not require a building permit, but setbacks still apply. The county's building-code overview also lists common exempt work such as painting, papering, tiling, carpeting, cabinets, countertops, qualifying small sheds, low decks, fences up to seven feet, certain retaining walls, sidewalks and driveways, and small above-ground pools; trade permits may still be required. Agricultural structures on parcels of at least 20 acres used exclusively for qualifying agricultural purposes are not subject to the State Building Code but still require an agricultural permit.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?