Who issues permits
Carver County Public Services Division is the county office listed for building permits in Carver County.
Also listed: Land Management Department; Metro West Inspection Services for building inspections, with cities handling city-jurisdiction work.
How to get a permit in Carver County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Fill in the application from carvercountymn.gov and submit it as the form directs.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Carver County permit records
No online permit portal is listed, so permit history is kept by Carver County Public Services Division. Call (952) 361-1820 or visit Carver County Land Management, 600 East 4th Street, Chaska, MN 55318 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Carver County Public Services Division publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Carver County administers zoning and building-code permits in the county's townships; construction in city jurisdictions is reviewed by the city. The current Minnesota framework is the 2020 Minnesota State Building Code and related 2020 Minnesota Residential, Mechanical and Fuel Gas, Plumbing, Accessibility, Existing Building, and other chapters, with the 2024 Minnesota Commercial Energy Code; electrical permits filed before August 17, 2026 follow the 2023 NEC, with the 2026 NEC scheduled to take effect August 17, 2026. The county's current application requires an energy-code compliance certificate and routes inspections to Metro West Inspection Services.
Minnesota: partial statewide code. Details
Work that may not need a permit
Building permits are required for structures over 200 square feet and for new construction, additions, driveways, work to existing structures, and regulated electrical, gas, plumbing, or mechanical work. Structures 200 square feet or less do not require a building permit, but setbacks still apply. The county's building-code overview also lists common exempt work such as painting, papering, tiling, carpeting, cabinets, countertops, qualifying small sheds, low decks, fences up to seven feet, certain retaining walls, sidewalks and driveways, and small above-ground pools; trade permits may still be required. Agricultural structures on parcels of at least 20 acres used exclusively for qualifying agricultural purposes are not subject to the State Building Code but still require an agricultural permit.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
After application submittal, review, approval, and issuance are complete, schedule inspections with Metro West Inspection Services at (763) 479-1720. Inspections require at least 24 hours' advance notice and are scheduled Monday-Friday, 7:00 a.m.-4:30 p.m.; same-day service is not guaranteed. The applicant must keep approved plans and inspection records on site and ensure work is exposed and accessible.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Carver County code requires an investigation fee in addition to the permit fee whenever permit-required work begins without first obtaining a permit; payment does not eliminate other code penalties. The county's published code does not state a fixed investigation amount in the cited section, so the amount is N/A and must be confirmed with Land Management.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at (952) 361-1820 about:
- Review times: how long plan review currently takes. No fixed county review timeline was published. Incomplete or unpaid applications can expire after 180 days, and the current application requires complete plans and supporting documents before review.
Minnesota rules that apply in Carver County
These rules come from Minnesota law and state agencies, so they apply in Carver County on top of anything the local office requires.
Building code
Partial statewide code
Under Minnesota Statutes 326B.121, the State Building Code applies statewide and overrides any local building code. Local enforcement is a separate question. A municipality that had adopted the code by January 1, 2008 must keep enforcing it and cannot repeal its ordinance.
Read more
That rule does not bind municipalities under 2,500 people outside a metropolitan county. Other municipalities may choose to adopt and enforce the code, and agricultural buildings are largely exempt. For homes, the current code is the 2020 Minnesota Residential Code (Minnesota Rules chapter 1309), which amends the 2018 International Residential Code. It is part of the 2020 State Building Code, which took effect March 31, 2020. Minnesota replaces the IRC's energy, mechanical, plumbing and electrical chapters with its own codes. These include the 2020 Minnesota Residential Energy Code, the 2020 Minnesota Mechanical and Fuel Gas Code, the 2020 Minnesota Plumbing Code (based on the IAPMO plumbing code) and the Minnesota Electrical Code. Electrical work follows the 2026 National Electrical Code for permits filed on or after August 17, 2026. Permits filed before that date follow the 2023 NEC. An update is underway. On February 2, 2026, DLI published requests for comments on rules that would adopt the 2024 IRC, including its energy chapter, with Minnesota amendments. As of October 2026, DLI's rulemaking dockets list the proposed rules, hearing and effective date as "to be determined," so the 2018-based code is still in force.
Minnesota Department of Labor and Industry, Construction Codes and Licensing Division ↗
Outside city limits
Minnesota has no single rule for who issues building permits outside cities. It depends on whether your city, township or county has adopted the State Building Code. DLI's overview says the code cannot be enforced by a municipality unless it is adopted by local ordinance, so in townships and counties that have not adopted it there may be no building permit or building inspection for a house.
Read more
The code still sets the legal standard there. A city may, with the township board's permission, extend its code enforcement up to two miles into unincorporated territory next to it. Zoning, septic and other local permits can still apply where there is no building code enforcement. Electrical permits are required statewide: where no local electrical inspection ordinance exists, you file with DLI and a state inspector inspects. In areas with no local inspection department, DLI also handles plumbing inspections. Use DLI's Local Code Lookup to see who enforces the code where you live.
Contractor and trade licensing
DLI licenses residential building contractors, residential remodelers and residential roofers. A license is required to contract directly with the owner of a one- to four-unit home for work in more than one of eight "special skills": excavation, masonry and concrete, carpentry, interior finishing, exterior finishing, drywall and plaster, roofing, and general installation specialties.
Read more
A remodeler works only on existing structures, while a building contractor can also build new ones. Contractors who offer only one special skill generally do not need the license, but roofers do. Contractors whose gross annual receipts from licensed residential work stay under $15,000 can get a certificate of exemption instead (Minnesota Statutes 326B.805). Since July 1, 2023, companies that install solar panels on homes must hold a building contractor or remodeler license. Homeowners do not need a contractor license to build or improve a home they live in, will live in, or will keep as a rental. That exemption does not cover building for resale or speculation, and an owner who builds or improves more than one property within 24 months is presumed to be speculating unless the properties will be kept as rentals. Whether a homeowner can pull the building permit is up to the local building department.
Electrical, plumbing and HVAC
DLI licenses electricians and electrical contractors, and plumbers and plumbing contractors, statewide. Under Minnesota Statutes 326B.36, electrical installations are inspected by the state unless a local government has an electrical inspection ordinance.
Read more
DLI's directory shows for each city or township whether the authority having jurisdiction is the state or the local government. A homeowner does not need an electrical license to do electrical work personally on a home they own and live in, or will live in once it is built, if the home has its own electrical service not shared with another dwelling (326B.33, subdivision 21). A homeowner still needs a permit and inspection. Unlicensed people may also do plumbing on premises they own and actually occupy as a residence, if the work meets the plumbing code and no local ordinance forbids it (326B.46). DLI inspects plumbing in areas with no local inspection department or building official, and it inspects public buildings and state-licensed facilities in areas that have not adopted the State Building Code.
State programs that can affect your permit
State electrical permits and inspections
DLI inspects electrical work wherever a city or township has not adopted its own electrical inspection program. Before filing, check the authority having jurisdiction in DLI's electrical inspector directory. If it says "State," you file the permit with DLI, online through iMS or on paper. Homeowners use separate application forms for new homes and existing homes.
State plumbing inspections
DLI's regional plumbing standards representatives inspect projects in areas with no local inspection department or building official. They also inspect public buildings and state-licensed facilities in parts of the state where the code is not locally enforced, and some code-enforced areas.
Manufactured structures
DLI regulates the construction and installation of manufactured homes and prefabricated buildings and licenses manufactured home manufacturers, dealers and installers. It also reviews prefabricated building plans for compliance with the State Building Code, including building, plumbing, mechanical, electrical and energy.
Verified October 28, 2026 against Minnesota sources. Minnesota permit rules, sources and other counties
Common projects in Carver County
Minnesota has statewide rules on file for 5 of these projects; they apply in Carver County along with local permit requirements.
Decks
Where the State Building Code is enforced, a deck or platform no more than 30 inches above grade does not need a building permit, as long as it is not attached to a structure with frost footings and is not part of an accessible route (Minnesota Rules 1300.0120).
Also named in Carver County’s exemption summary.
Fences
Where the State Building Code is enforced, fences no taller than seven feet are exempt from a building permit (Minnesota Rules 1300.0120). Local zoning rules on height and placement still apply.
Also named in Carver County’s exemption summary.
Sheds and accessory buildings
Where the State Building Code is enforced, a one-story detached shed, playhouse or similar accessory building of 200 square feet or less does not need a building permit (Minnesota Rules 1300.0120). Electrical and plumbing permits may still be needed, and local zoning still applies.
Also named in Carver County’s exemption summary.
Minnesota source: revisor.mn.gov ↗ · Sheds and accessory buildings permit guide
Electrical work
Electrical work needs a permit and inspection throughout Minnesota, from DLI or from a city with its own electrical inspection program. Permits filed on or after August 17, 2026 must meet the 2026 National Electrical Code.
Also named in Carver County’s exemption summary.
Minnesota source: dli.mn.gov ↗ · Electrical work permit guide
Rooftop solar
Since July 1, 2023, companies that install solar panels on Minnesota homes must be licensed by DLI as a residential building contractor or remodeler. The electrical part of the installation must be done by a Minnesota-licensed electrical contractor.
Named in Carver County’s exemption summary (read it before assuming the work is exempt): Heating and air conditioning · Pools and spas · Plumbing work · Driveways and culverts
Guides for other projects: Roof replacement · Water heaters · Accessory dwelling units · Demolition · Septic systems · Floodplain development · Kitchen and bathroom remodels · Home additions and garages · All 21 project guides
Other permits you may need in Carver County
These are separate from the building permit and come from the agencies named, under Minnesota rules.
Septic system
County SSTS programs (some cities and townships) under MPCA rules
Counties, and some cities and townships, issue septic (SSTS) construction permits under MPCA rules (Minn. R. ch. 7080-7083). The application needs a site evaluation and design, normally by an MPCA-licensed SSTS professional, and the finished system gets a compliance inspection. Before signing a sale agreement, the seller must disclose the system in writing (Minn. Stat. 115.55, subd. 6).
Floodplain development
Minnesota DNR; city or county floodplain ordinance
Cities and counties adopt and enforce floodplain ordinances, which the DNR must approve (Minn. Stat. 103F.121), and issue the local permits. State rules set the flood protection elevation at least 1 foot above the regional (100-year) flood and limit floodway encroachments to a 0.5-foot rise in flood stage (Minn. R. 6120.5700).
Official page: revisor.mn.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
Minnesota Department of Transportation (MnDOT)
A driveway or other access onto a state trunk highway needs a MnDOT Access/Driveway Permit, and drainage changes in trunk highway right of way need a separate MnDOT Drainage Permit. Most permit applications can be submitted online through MnDOT's OLPA system.
Official page: dot.state.mn.us ↗ · Driveway and culvert guide
Erosion and sediment control
Minnesota Pollution Control Agency (MPCA)
Construction that disturbs one acre or more, or less than an acre if it is part of a larger common plan of development or sale, needs an NPDES/SDS construction stormwater permit from the MPCA (Minn. R. 7090.2010). The owner and operator must apply before land disturbance starts.
Water well
Minnesota Department of Health (MDH)
Wells must be built by an MDH-licensed well contractor, except that an individual may build a well on land they own or lease for their home or farm. Before drilling, the contractor or owner files a well notification with MDH and pays the fee, and the well must meet Minn. Stat. ch. 103I and Minn. R. ch. 4725.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Carver County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at (952) 361-1820 if you are unsure.
Can I apply for a permit online in Carver County?
No online permit portal was found for this listing. The agency does publish application forms and a fee schedule online, which may need to be submitted by mail or in person. Contact the office at (952) 361-1820 to ask how applications are accepted.
How much does a building permit cost in Carver County?
Carver County Public Services Division publishes its fee schedule online (carvercountymn.gov). Look up your project type there, and ask the office at (952) 361-1820 for an estimate if your project is not listed.
How do I look up past permits for an address in Carver County?
There is no online permit search for this listing. Ask the office at (952) 361-1820 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.
Can I check a contractor's license for work in Carver County?
Yes, at dli.mn.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Carver County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Carver County borders Hennepin County, McLeod County, Scott County, Sibley County, Wright County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Carver County.
