County Permit SearchU.S. compliance directory
MinnesotaBrown County

Administrative overview · FIPS 27015

Brown County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Brown County Planning & Zoning Department

For a project in or near Brown County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(507) 233-6640

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Brown County Planning & Zoning, 14 South State Street, 2nd Floor, New Ulm, MN 56073

Operating hours

Monday-Friday, 8:00 a.m.-4:30 p.m.

Review expectation

N/A for ordinary building permits; no fixed review timeline was published. Zoning permits are valid for one year, with limited yearly extensions available under the ordinance.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Brown County

Who handles permitting for this jurisdiction?

Brown County Planning & Zoning Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (507) 233-6640.

How long might review take?

N/A for ordinary building permits; no fixed review timeline was published. Zoning permits are valid for one year, with limited yearly extensions available under the ordinance.

How are inspections scheduled?

The Planning & Zoning Department states that it issues building permits and provides inspections. Contact the office at (507) 233-6640 through the online permit portal for inspection instructions and status; septic installers must provide the county at least two working days' notice for a required inspection.

Which codes and exemptions should I review?

Brown County issues building permits and provides inspections in unincorporated areas. Its zoning ordinance states that Brown County will employ or contract with certified building officials as needed to enforce the Minnesota State Building Code for new buildings and structures. The current Minnesota framework is the 2020 Minnesota State Building Code and related 2020 Residential, Mechanical and Fuel Gas, Plumbing, Accessibility, Existing Building, and other chapters, with the 2024 Minnesota Commercial Energy Code; electrical permits filed before August 17, 2026 follow the 2023 NEC, with the 2026 NEC scheduled to take effect August 17, 2026. The fee schedule lists exterior alterations to dwellings, agricultural, non-agricultural, and commercial structures at $20 and identifies no-footprint-change examples such as shingling, windows, siding, and enclosing a porch. However, the zoning ordinance broadly requires a permit before erection, addition, modification, rehabilitation including normal maintenance and repair, or alteration, so applicants should confirm whether a particular cosmetic project is exempt rather than assume it is.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?