MinnesotaBenton County

Administrative overview · FIPS 27009

Benton County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Benton County Planning & Zoning / Land Services; Inspection Services of Central Minnesota for county building-code inspections, with municipal exceptions

For a project in or near Benton County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Planning & Zoning: (320) 968-5065; building official office: (320) 532-3629; inspection scheduling: (320) 532-3629

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Benton County Government Center, 531 Dewey Street, Foley, MN 56329

Operating hours

Monday-Friday, 8:00 a.m.-4:30 p.m.

Review expectation

A site inspection generally occurs within two weeks of the application date. Minnesota Statute 15.99 allows up to 60 days for approval or denial; the county calls the applicant when review is complete, and issuance follows inspection and payment of fees.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Benton County

Who handles permitting for this jurisdiction?

Benton County Planning & Zoning / Land Services; Inspection Services of Central Minnesota for county building-code inspections, with municipal exceptions is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Planning & Zoning: (320) 968-5065; building official office: (320) 532-3629; inspection scheduling: (320) 532-3629.

How long might review take?

A site inspection generally occurs within two weeks of the application date. Minnesota Statute 15.99 allows up to 60 days for approval or denial; the county calls the applicant when review is complete, and issuance follows inspection and payment of fees.

How are inspections scheduled?

The county application states that the applicant is responsible for scheduling building-code inspections. For county areas, contact Inspection Services of Central Minnesota / David Barsody; the official application gives (320) 532-3629 for scheduling and (612) 219-2252 for the building official. The site must be staked before review, and a staff member generally inspects within two weeks of application. Watab Township uses AllSpec Services at (320) 293-5298.

Which codes and exemptions should I review?

Benton County enforces the Minnesota State Building Code in areas where it issues building permits. The current Minnesota framework is the 2020 Minnesota State Building Code and related 2020 Minnesota Residential, Mechanical and Fuel Gas, Plumbing, Accessibility, Existing Building, and other code chapters, with the 2024 Minnesota Commercial Energy Code; electrical permits filed before August 17, 2026 follow the 2023 NEC, with the 2026 NEC scheduled to take effect August 17, 2026. Building review and inspections are contracted through Inspection Services of Central Minnesota, except Watab Township, which uses its own contracted inspection service. Structures 200 square feet or larger generally require both a county land-use permit and a building permit. Agricultural buildings are exempt from the building-code permit, but still require a land-use permit. Permit authority shifts to Foley, Rice, Gilman, St. Cloud, Sartell, Royalton, Sauk Rapids, applicable orderly-annexation areas, or Watab Township as identified by the county; ordinary cosmetic work and smaller structures should be confirmed with the applicable authority.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?