Who issues permits
No countywide building permit office was identified for Plymouth County. The listing points to Town of Plymouth Inspectional Services Department. Inside city or town limits, the city or town issues building permits.
Representative municipal fallback.
Outside city limits in Massachusetts
Massachusetts has no unincorporated county land, and counties do not issue building permits. The State Building Code is enforced by the local building official, defined in 780 CMR 103.1 as the building commissioner or inspector of buildings, a local inspector, or the state building inspector.
Read more
Your permit comes from the city or town where the property sits. Septic permits come from the local board of health, and electrical and plumbing permits come from the town's wiring and plumbing inspectors.
More Massachusetts rules below · Confirm with the office at 508-322-3431 before you build.
How to get a permit in Plymouth County
- Find the office for your address: the city or town if you are inside its limits; outside them, the Massachusetts rule above decides.
- Apply online through the OpenGov portal at plymouthma.portal.opengov.com, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Plymouth County permit records
The listing’s online portal is at plymouthma.portal.opengov.com ↗ and runs on OpenGov. Use the portal’s search to find a record by address or record number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Town of Plymouth Inspectional Services Department at 508-322-3431. To follow your own application, search for its permit or application number.
Inside a city or town, permit records are kept by that municipality’s building department, not by Plymouth County.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Town of Plymouth Inspectional Services Department publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Massachusetts State Building Code 780 CMR Tenth Edition, based on the 2021 I-Codes with Massachusetts amendments, plus applicable Massachusetts Electrical, Plumbing/Gas, Mechanical, Fire and accessibility requirements, Plymouth zoning bylaws and the Town's Stretch Energy Code. Plymouth adopted the Stretch Energy Code effective January 1, 2021; current energy provisions are 225 CMR Chapter 22 for low-rise residential and Chapter 23 for commercial, multifamily and other construction.
Massachusetts: statewide code based on the 2021 IBC. Details
Work that may not need a permit
Plymouth's official Inspectional Services FAQ lists ordinary repairs and, subject to other laws and zoning, one-story detached sheds/playhouses up to 200 square feet for residential work, fences up to 7 feet, qualifying retaining walls up to 4 feet, grade-supported water tanks up to 5,000 gallons, sidewalks and driveways, painting/papering/tiling/carpeting/cabinets/countertops and similar finish work, qualifying pools under 24 inches deep, playground equipment, qualifying wall awnings, qualifying unattached decks up to 200 square feet and 30 inches above grade, and plastic-film greenhouses. Commercial exemptions are narrower; zoning permits or specialized trade permits may still be required.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Use the OpenGov Citizen Services portal to submit, track and complete the permit review and inspection process online 24/7. For questions or inspection assistance, call Inspectional Services at 508-322-3431; inspectors are generally available in the office from 7:30-9:30 AM before field inspections.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Plymouth's 2023 fee schedule imposes a late-filing fee of up to double the permit fee when the required permit is not filed before work begins, and lists a $150 fee to remove a stop-work order. The zoning bylaw also authorizes injunctions and fines of up to $300 per offense, with each continuing day a separate offense; noncriminal enforcement fines are $100 for a first offense, $200 for a second and $300 for third and subsequent offenses.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at 508-322-3431 about:
- Review times: how long plan review currently takes. The Town states that application accuracy and completeness directly affect processing time but does not publish a general review-time estimate.
Massachusetts rules that apply in Plymouth County
These rules come from Massachusetts law and state agencies, so they apply in Plymouth County on top of anything the local office requires.
Building code
Statewide code
780 CMR is the building code for all cities, towns and state agencies. The Tenth Edition base volume adopts the 2021 International Building Code with Massachusetts amendments. One- and two-family homes and townhouses up to three stories may follow the Massachusetts Residential Code (780 CMR 51.00), which adopts the 2021 International Residential Code with amendments.
Read more
Both took effect October 11, 2024. Applications filed through June 30, 2025 could use either the Ninth or Tenth Edition, but not a mix of the two. After that date, only the Tenth Edition applies. Energy rules come in three tiers. The base energy code is in 780 CMR. The Stretch Code and the Specialized Opt-in Code (225 CMR 22.00 for low-rise residential, last amended effective February 14, 2025) apply only where a city or town has voted to adopt them, so the energy rules for a new house depend on which code your community uses. The electrical code is separate (527 CMR 12.00, see trade licensing), and so is the plumbing code (248 CMR 10.00).
Contractor and trade licensing
Massachusetts has no general contractor license. It has two separate credentials. The Construction Supervisor License (CSL) is for the person who supervises work regulated by the building code. It comes as an unrestricted license (buildings under 35,000 cubic feet), a license limited to one- and two-family dwellings, a masonry license, and specialty licenses for roof covering, windows and siding, solid-fuel appliances, demolition, and insulation.
Read more
Home Improvement Contractor (HIC) registration under M.G.L. c. 142A is for businesses doing residential contracting on an existing owner-occupied home of one to four units. It also covers work on attached or nearby structures such as garages and sheds, with exemptions for jobs under $500 and for some narrow trades such as landscaping, interior painting, flooring and fencing. A homeowner doing work on their own home is exempt from the CSL. Under 780 CMR 110.R5, a homeowner is someone who lives, or intends to live, on their own lot with a one- or two-family dwelling, and building more than one home in two years disqualifies you. If you hire people to do the work, you act as their supervisor. Home improvement contracts over $1,000 must be in writing, and owners who pull their own permits lose access to the state's HIC Guaranty Fund.
Electrical, plumbing and HVAC
Electricians are licensed by the Board of State Examiners of Electricians (237 CMR), and plumbers and gas fitters by the Board of State Examiners of Plumbers and Gas Fitters (248 CMR).
Read more
Sheet metal workers, pipefitters and refrigeration technicians have their own state licenses. Plumbing and gas fitting need a permit from the local plumbing or gas inspector before work starts, and 248 CMR 3.05 says these permits are issued only to properly licensed individuals. Small repairs such as fixing a leaking faucet or clearing a stoppage do not need a permit. Electrical work follows the Massachusetts Electrical Code (527 CMR 12.00), which is now based on the 2026 NFPA 70 (National Electrical Code) and took effect April 24, 2026. Electrical permits are issued through the local inspector of wires using the state's uniform permit application. We could not confirm a clear statewide rule on whether a homeowner may get an electrical permit for their own home, so ask your town's inspector of wires before starting.
State programs that can affect your permit
Title 5 septic systems (310 CMR 15.000)
Building, upgrading or expanding a septic system needs a Disposal System Construction Permit from the local approving authority, which is normally the board of health. The septic system must be inspected within two years before a home is sold, or up to six months after if weather prevents it. An inspection is also required before an expansion or a change of use that needs a building or occupancy permit.
Stretch and Specialized Opt-in energy codes
Cities and towns choose between the base energy code, the Stretch Code, and the Specialized Opt-in Code. The Specialized Code applies only to new construction. A new mixed-fuel home under it must meet the Stretch Code, be pre-wired for future electrification, and have on-site solar where feasible. All-electric homes only need to meet the Stretch Code. Adoption and effective dates vary by community.
Home Improvement Contractor Guaranty Fund
Homeowners who hire a registered home improvement contractor can use state arbitration and the Guaranty Fund under 201 CMR 14.00 if the job goes wrong. You lose that protection if you hire an unregistered contractor or pull the construction permits yourself.
Verified October 28, 2026 against Massachusetts sources. Massachusetts permit rules, sources and other counties
Common projects in Plymouth County
Massachusetts has statewide rules on file for 6 of these projects; they apply in Plymouth County along with local permit requirements.
Decks
780 CMR 51.00 R105.2: no building permit for decks of 200 sq ft or less, not more than 30 inches above grade at any point, not attached to a dwelling, and not serving a required exit door. Other decks need a permit.
Also named in Plymouth County’s exemption summary.
Massachusetts source: law.cornell.edu ↗ · Decks permit guide
Fences
780 CMR 51.00 R105.2: no building permit for fences not over 7 feet high. Local zoning limits still apply.
Also named in Plymouth County’s exemption summary.
Massachusetts source: law.cornell.edu ↗ · Fences permit guide
Sheds and accessory buildings
780 CMR 51.00 R105.2: no building permit for one-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, if the floor area does not exceed 200 sq ft.
Also named in Plymouth County’s exemption summary.
Massachusetts source: law.cornell.edu ↗ · Sheds and accessory buildings permit guide
Roof replacement
Roofing is not on the Residential Code's list of work exempt from a permit. A contractor doing roof work needs a Construction Supervisor License that covers it (unrestricted, one- and two-family, or the Roof Covering specialty, which allows replacing up to 25% of sheathing and rafters).
Massachusetts source: law.cornell.edu ↗ · Roof replacement permit guide
Electrical work
Electrical work follows the Massachusetts Electrical Code, 527 CMR 12.00, based on the 2026 NFPA 70 and effective April 24, 2026. Permits are issued by the local inspector of wires.
Massachusetts source: icc-nta.org ↗ · Electrical work permit guide
Accessory dwelling units
Under M.G.L. c. 40A, s. 3 (Affordable Homes Act, in effect February 2, 2025) and 760 CMR 71.00, one ADU of up to 900 sq ft or half the main home's floor area, whichever is smaller, is allowed by right in single-family zoning districts.
Read more
A town cannot require a special permit, owner occupancy, or more than one parking space (none within 0.5 mile of transit). A building permit is still required.
Massachusetts source: law.cornell.edu ↗ · Accessory dwelling units permit guide
Named in Plymouth County’s exemption summary (read it before assuming the work is exempt): Pools and spas · Driveways and culverts
Guides for other projects: Water heaters · Heating and air conditioning · Rooftop solar · Demolition · Plumbing work · Septic systems · Floodplain development · Kitchen and bathroom remodels · All 21 project guides
Other permits you may need in Plymouth County
These are separate from the building permit and come from the agencies named, under Massachusetts rules.
Septic system
Local board of health (Title 5, 310 CMR 15.000)
Building, upgrading or expanding a septic system needs a Disposal System Construction Permit from the board of health after a site evaluation by a MassDEP-approved Soil Evaluator, and a Certificate of Compliance when finished (310 CMR 15.020).
Read more
A MassDEP-approved System Inspector must inspect the system within two years before a sale, or within six months after if weather prevents it (310 CMR 15.301).
Floodplain development
Local conservation commission (Wetlands Protection Act)
Filling, building or other alteration in land subject to flooding (the 100-year floodplain of rivers, streams and ponds, based on NFIP data) or land subject to coastal storm flowage needs a Notice of Intent to the local conservation commission under the Wetlands Protection Act (M.G.L. c. 131 §40). Lost flood storage must be replaced with equal compensatory storage (310 CMR 10.57).
Official page: law.cornell.edu ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Erosion and sediment control
U.S. EPA Region 1 (New England)
Massachusetts does not run the federal NPDES permit program, so EPA covers construction stormwater. Sites disturbing one acre or more, or less if part of a common plan of development or sale that will disturb one acre or more, need coverage under EPA's 2022 Construction General Permit. Work within 100 feet of a wetland, bank or water body also needs conservation commission review (310 CMR 10.02).
Water well
City or town board of health
Private wells are regulated by the city or town board of health under local well regulations, so permit and testing rules vary by town. Westford, for example, issues well permits through its town permitting system and requires water testing of bedrock drinking water wells, including when a property is sold.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does Plymouth County have a countywide building permit office?
No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, Massachusetts law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.
Can I apply for a permit online in Plymouth County?
Yes. The listing includes an online permit portal at plymouthma.portal.opengov.com. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Plymouth County?
Town of Plymouth Inspectional Services Department publishes its fee schedule online (plymouth-ma.gov). Look up your project type there, and ask the office at 508-322-3431 for an estimate if your project is not listed.
How do I look up past permits for an address in Plymouth County?
Start with the OpenGov portal at plymouthma.portal.opengov.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 508-322-3431 for the file or send a public records request.
Can I check a contractor's license for work in Plymouth County?
Yes, at contractorhub.mass.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Plymouth County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Plymouth County borders Barnstable County, Bristol County, Norfolk County, Suffolk County.