Who issues permits
Town and County of Nantucket Planning and Land Use Services (PLUS) is the county office listed for building permits in Nantucket County.
Also listed: Building Division.
How to get a permit in Nantucket County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the Tyler EnerGov Citizen Self Service portal at nantucketma-energovweb.tylerhost.net, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Nantucket County permit records
The listing’s online portal is at nantucketma-energovweb.tylerhost.net ↗ and runs on Tyler EnerGov Citizen Self Service. Use the portal’s Search to find permits, plans and inspections by permit number or address.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Town and County of Nantucket Planning and Land Use Services at 508-325-7587. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Town and County of Nantucket Planning and Land Use Services publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Massachusetts State Building Code 780 CMR Tenth Edition with Massachusetts amendments, Nantucket zoning and historic-district requirements, and applicable electrical, plumbing/gas, mechanical, fire and accessibility codes. Nantucket enforces the Massachusetts Stretch Energy Code for new residential dwellings and large commercial projects; its 2025 checklist identifies IECC 2021 with key Massachusetts amendments, including 225 CMR Chapters 22 and 23.
Massachusetts: statewide code based on the 2021 IBC. Details
Work that may not need a permit
Nantucket requires a building permit for regulated construction and maintains a separate $50 zoning permit category for sheds up to 200 square feet, so zoning review can still apply to small accessory structures. Ordinary repairs and minor cosmetic work that 780 CMR exempts may not require a building permit, but specialized electrical, plumbing/gas, historic-district, zoning, conservation or other approvals can still be required; confirm with PLUS before starting.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Call 508-325-7587 to schedule a building inspection or appointment. Wiring inspections may be arranged by phone at extension 7018; plumbing/gas inspections at extension 7013; appointments may also be made in person during office hours. The CSS portal supports permit status and online scheduling for applicable permit types.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Nantucket's Building Division fee schedule imposes a late-filing fee equal to four times the applicable fee when construction begins before permit issuance or before the permit is posted at the site, and additional inspections after failure or for on-site guidance cost $50 in advance. Code-compliance, stop-work and other state or Town enforcement remedies may also apply.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at 508-325-7587 about:
- Review times: how long plan review currently takes.
Massachusetts rules that apply in Nantucket County
These rules come from Massachusetts law and state agencies, so they apply in Nantucket County on top of anything the local office requires.
Building code
Statewide code
780 CMR is the building code for all cities, towns and state agencies. The Tenth Edition base volume adopts the 2021 International Building Code with Massachusetts amendments. One- and two-family homes and townhouses up to three stories may follow the Massachusetts Residential Code (780 CMR 51.00), which adopts the 2021 International Residential Code with amendments.
Read more
Both took effect October 11, 2024. Applications filed through June 30, 2025 could use either the Ninth or Tenth Edition, but not a mix of the two. After that date, only the Tenth Edition applies. Energy rules come in three tiers. The base energy code is in 780 CMR. The Stretch Code and the Specialized Opt-in Code (225 CMR 22.00 for low-rise residential, last amended effective February 14, 2025) apply only where a city or town has voted to adopt them, so the energy rules for a new house depend on which code your community uses. The electrical code is separate (527 CMR 12.00, see trade licensing), and so is the plumbing code (248 CMR 10.00).
Outside city limits
Massachusetts has no unincorporated county land, and counties do not issue building permits. The State Building Code is enforced by the local building official, defined in 780 CMR 103.1 as the building commissioner or inspector of buildings, a local inspector, or the state building inspector.
Read more
Your permit comes from the city or town where the property sits. Septic permits come from the local board of health, and electrical and plumbing permits come from the town's wiring and plumbing inspectors.
Contractor and trade licensing
Massachusetts has no general contractor license. It has two separate credentials. The Construction Supervisor License (CSL) is for the person who supervises work regulated by the building code. It comes as an unrestricted license (buildings under 35,000 cubic feet), a license limited to one- and two-family dwellings, a masonry license, and specialty licenses for roof covering, windows and siding, solid-fuel appliances, demolition, and insulation.
Read more
Home Improvement Contractor (HIC) registration under M.G.L. c. 142A is for businesses doing residential contracting on an existing owner-occupied home of one to four units. It also covers work on attached or nearby structures such as garages and sheds, with exemptions for jobs under $500 and for some narrow trades such as landscaping, interior painting, flooring and fencing. A homeowner doing work on their own home is exempt from the CSL. Under 780 CMR 110.R5, a homeowner is someone who lives, or intends to live, on their own lot with a one- or two-family dwelling, and building more than one home in two years disqualifies you. If you hire people to do the work, you act as their supervisor. Home improvement contracts over $1,000 must be in writing, and owners who pull their own permits lose access to the state's HIC Guaranty Fund.
Electrical, plumbing and HVAC
Electricians are licensed by the Board of State Examiners of Electricians (237 CMR), and plumbers and gas fitters by the Board of State Examiners of Plumbers and Gas Fitters (248 CMR).
Read more
Sheet metal workers, pipefitters and refrigeration technicians have their own state licenses. Plumbing and gas fitting need a permit from the local plumbing or gas inspector before work starts, and 248 CMR 3.05 says these permits are issued only to properly licensed individuals. Small repairs such as fixing a leaking faucet or clearing a stoppage do not need a permit. Electrical work follows the Massachusetts Electrical Code (527 CMR 12.00), which is now based on the 2026 NFPA 70 (National Electrical Code) and took effect April 24, 2026. Electrical permits are issued through the local inspector of wires using the state's uniform permit application. We could not confirm a clear statewide rule on whether a homeowner may get an electrical permit for their own home, so ask your town's inspector of wires before starting.
State programs that can affect your permit
Title 5 septic systems (310 CMR 15.000)
Building, upgrading or expanding a septic system needs a Disposal System Construction Permit from the local approving authority, which is normally the board of health. The septic system must be inspected within two years before a home is sold, or up to six months after if weather prevents it. An inspection is also required before an expansion or a change of use that needs a building or occupancy permit.
Stretch and Specialized Opt-in energy codes
Cities and towns choose between the base energy code, the Stretch Code, and the Specialized Opt-in Code. The Specialized Code applies only to new construction. A new mixed-fuel home under it must meet the Stretch Code, be pre-wired for future electrification, and have on-site solar where feasible. All-electric homes only need to meet the Stretch Code. Adoption and effective dates vary by community.
Home Improvement Contractor Guaranty Fund
Homeowners who hire a registered home improvement contractor can use state arbitration and the Guaranty Fund under 201 CMR 14.00 if the job goes wrong. You lose that protection if you hire an unregistered contractor or pull the construction permits yourself.
Verified October 28, 2026 against Massachusetts sources. Massachusetts permit rules, sources and other counties
Common projects in Nantucket County
Massachusetts has statewide rules on file for 6 of these projects; they apply in Nantucket County along with local permit requirements.
Decks
780 CMR 51.00 R105.2: no building permit for decks of 200 sq ft or less, not more than 30 inches above grade at any point, not attached to a dwelling, and not serving a required exit door. Other decks need a permit.
Massachusetts source: law.cornell.edu ↗ · Decks permit guide
Fences
780 CMR 51.00 R105.2: no building permit for fences not over 7 feet high. Local zoning limits still apply.
Massachusetts source: law.cornell.edu ↗ · Fences permit guide
Sheds and accessory buildings
780 CMR 51.00 R105.2: no building permit for one-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, if the floor area does not exceed 200 sq ft.
Also named in Nantucket County’s exemption summary.
Massachusetts source: law.cornell.edu ↗ · Sheds and accessory buildings permit guide
Roof replacement
Roofing is not on the Residential Code's list of work exempt from a permit. A contractor doing roof work needs a Construction Supervisor License that covers it (unrestricted, one- and two-family, or the Roof Covering specialty, which allows replacing up to 25% of sheathing and rafters).
Massachusetts source: law.cornell.edu ↗ · Roof replacement permit guide
Electrical work
Electrical work follows the Massachusetts Electrical Code, 527 CMR 12.00, based on the 2026 NFPA 70 and effective April 24, 2026. Permits are issued by the local inspector of wires.
Also named in Nantucket County’s exemption summary.
Massachusetts source: icc-nta.org ↗ · Electrical work permit guide
Accessory dwelling units
Under M.G.L. c. 40A, s. 3 (Affordable Homes Act, in effect February 2, 2025) and 760 CMR 71.00, one ADU of up to 900 sq ft or half the main home's floor area, whichever is smaller, is allowed by right in single-family zoning districts.
Read more
A town cannot require a special permit, owner occupancy, or more than one parking space (none within 0.5 mile of transit). A building permit is still required.
Massachusetts source: law.cornell.edu ↗ · Accessory dwelling units permit guide
Named in Nantucket County’s exemption summary (read it before assuming the work is exempt): Plumbing work
Guides for other projects: Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · Demolition · Septic systems · Driveways and culverts · Floodplain development · All 21 project guides
Other permits you may need in Nantucket County
These are separate from the building permit and come from the agencies named, under Massachusetts rules.
Septic system
Local board of health (Title 5, 310 CMR 15.000)
Building, upgrading or expanding a septic system needs a Disposal System Construction Permit from the board of health after a site evaluation by a MassDEP-approved Soil Evaluator, and a Certificate of Compliance when finished (310 CMR 15.020).
Read more
A MassDEP-approved System Inspector must inspect the system within two years before a sale, or within six months after if weather prevents it (310 CMR 15.301).
Floodplain development
Local conservation commission (Wetlands Protection Act)
Filling, building or other alteration in land subject to flooding (the 100-year floodplain of rivers, streams and ponds, based on NFIP data) or land subject to coastal storm flowage needs a Notice of Intent to the local conservation commission under the Wetlands Protection Act (M.G.L. c. 131 §40). Lost flood storage must be replaced with equal compensatory storage (310 CMR 10.57).
Official page: law.cornell.edu ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Erosion and sediment control
U.S. EPA Region 1 (New England)
Massachusetts does not run the federal NPDES permit program, so EPA covers construction stormwater. Sites disturbing one acre or more, or less if part of a common plan of development or sale that will disturb one acre or more, need coverage under EPA's 2022 Construction General Permit. Work within 100 feet of a wetland, bank or water body also needs conservation commission review (310 CMR 10.02).
Water well
City or town board of health
Private wells are regulated by the city or town board of health under local well regulations, so permit and testing rules vary by town. Westford, for example, issues well permits through its town permitting system and requires water testing of bedrock drinking water wells, including when a property is sold.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Nantucket County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 508-325-7587 if you are unsure.
Can I apply for a permit online in Nantucket County?
Yes. The listing includes an online permit portal at nantucketma-energovweb.tylerhost.net. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Nantucket County?
Town and County of Nantucket Planning and Land Use Services publishes its fee schedule online (nantucket-ma.gov). Look up your project type there, and ask the office at 508-325-7587 for an estimate if your project is not listed.
How do I look up past permits for an address in Nantucket County?
Start with the Tyler EnerGov Citizen Self Service portal at nantucketma-energovweb.tylerhost.net and search by address, parcel or permit number. If an older permit is not there, ask the office at 508-325-7587 for the file or send a public records request.
Can I check a contractor's license for work in Nantucket County?
Yes, at contractorhub.mass.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Nantucket County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Nantucket County borders Dukes County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Nantucket County.
