County Permit SearchU.S. compliance directory
MassachusettsNantucket County

Administrative overview · FIPS 25019

Nantucket County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Town and County of Nantucket Planning and Land Use Services (PLUS), Building Division

For a project in or near Nantucket County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

508-325-7587

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

2 Fairgrounds Road, Nantucket, MA 02554

Operating hours

Monday-Friday 7:30 AM-4:00 PM; field inspector available 7:30-8:00 AM; wiring and plumbing/gas inspectors generally available 7:30-9:00 AM.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Nantucket County

Who handles permitting for this jurisdiction?

Town and County of Nantucket Planning and Land Use Services (PLUS), Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 508-325-7587.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Call 508-325-7587 to schedule a building inspection or appointment. Wiring inspections may be arranged by phone at extension 7018; plumbing/gas inspections at extension 7013; appointments may also be made in person during office hours. The CSS portal supports permit status and online scheduling for applicable permit types.

Which codes and exemptions should I review?

Massachusetts State Building Code 780 CMR Tenth Edition with Massachusetts amendments, Nantucket zoning and historic-district requirements, and applicable electrical, plumbing/gas, mechanical, fire and accessibility codes. Nantucket enforces the Massachusetts Stretch Energy Code for new residential dwellings and large commercial projects; its 2025 checklist identifies IECC 2021 with key Massachusetts amendments, including 225 CMR Chapters 22 and 23. Nantucket requires a building permit for regulated construction and maintains a separate $50 zoning permit category for sheds up to 200 square feet, so zoning review can still apply to small accessory structures. Ordinary repairs and minor cosmetic work that 780 CMR exempts may not require a building permit, but specialized electrical, plumbing/gas, historic-district, zoning, conservation or other approvals can still be required; confirm with PLUS before starting.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?