County Permit SearchU.S. compliance directory
MassachusettsFranklin County

Administrative overview · FIPS 25011

Franklin County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Franklin County Cooperative Inspection Program (FCCIP), Franklin Regional Council of Governments (serves participating municipalities)

For a project in or near Franklin County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

413-774-3167 ext. 2; building inspection requests ext. 109 or 114

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

12 Olive Street, Suite 2, Greenfield, MA 01301

Operating hours

Building Inspection Program: Monday-Friday 8:00 AM-4:00 PM. Electrical Inspection Program: Monday-Friday 7:00-9:00 AM. Plumbing and Gas Inspection Program: Monday-Thursday 7:00-9:00 AM.

Review expectation

N/A; FCCIP publishes program hours and application review through PermitEyes but no standard plan-review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Franklin County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 413-774-3167 ext. 2; building inspection requests ext. 109 or 114.

How long might review take?

N/A; FCCIP publishes program hours and application review through PermitEyes but no standard plan-review timeline.

How are inspections scheduled?

Applicants must notify the building official of required inspections; concealed work may not proceed until required inspections are approved. FCCIP processes footing/foundation, slab, framing, roofing, fire, accessibility, energy, mechanical, egress and final inspections as applicable. Call 413-774-3167 ext. 109 or 114 for building inspection requests, ext. 115 for electrical, or ext. 112 for plumbing/gas. PermitEyes sends application and review notifications by email.

Which codes and exemptions should I review?

Current 780 CMR 10th Edition Massachusetts State Building Code based on the 2021 I-Codes with Massachusetts amendments, Massachusetts 521 CMR accessibility requirements, applicable fire/plumbing/gas/electrical codes, and each participating municipality’s zoning bylaws. FCCIP also links the applicable Stretch Energy Code resources. FCCIP’s permit guide requires applications for new homes, additions, garages, storage sheds (including sheds 200 square feet or less, which still require a residential permit application and must meet zoning setbacks), decks, ramps, roofing, siding, window or exterior-door replacement, pools/hot tubs/spas, retaining walls over 4 feet, fireplaces/stoves/chimneys, demolition, signs, changes of use and structural interior renovations. Ordinary repairs are exempt only when maintenance does not affect structure, egress, fire protection, fire ratings, energy conservation, plumbing, sanitary, gas, electrical, utilities or other regulated systems.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?