County Permit SearchU.S. compliance directory
KentuckyBourbon County

Administrative overview · FIPS 21017

Bourbon County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Bourbon County Joint Planning Commission / Bourbon County Planning Administrator and Building Inspector

For a project in or near Bourbon County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

859-987-2150

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Bourbon County Joint Planning, 525 High Street, Suite 126, Paris, KY 40361

Operating hours

Monday-Friday, 8:30 a.m.-4:30 p.m.

Review expectation

N/A. No published building-plan review timeline was found.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Bourbon County

Who handles permitting for this jurisdiction?

Bourbon County Joint Planning Commission / Bourbon County Planning Administrator and Building Inspector is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 859-987-2150.

How long might review take?

N/A. No published building-plan review timeline was found.

How are inspections scheduled?

Contact Michelle Thornsburg, Planning Administrator/Building Inspector Level II, at 859-987-2150 or mthornsburg@paris.ky.gov. The official state inspector sheet identifies her as the local building inspector for both the City of Paris and Bourbon County. Electrical inspection arrangements are made through the county judge executive’s office or the city office where work occurs; plumbing office hours are Friday 8:00-9:30 a.m. at the Bourbon County Health Department, 341 East Main Street, Paris, KY 40361, 859-298-8721.

Which codes and exemptions should I review?

The local inspector administers the Kentucky Building Code and Kentucky Residential Code through the county/local building inspection program. Kentucky’s current framework is the 2018 Kentucky Building Code and 2018 Kentucky Residential Code, based on the 2015 IBC/IRC with Kentucky amendments. No newer 2026 code adoption was verified. No county-specific minor-work exemption list was published on the verified pages. Kentucky code exemptions generally include qualifying small detached sheds/playhouses, fences up to 7 feet, retaining walls up to 4 feet, sidewalks/driveways, ordinary finish work, qualifying awnings and decks, and minor electrical, mechanical, gas, or plumbing work; confirm applicability with the local inspector. Agricultural and other exemptions may also depend on the applicable Kentucky statutes and regulations.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?