County Permit SearchU.S. compliance directory
KentuckyBallard County

Administrative overview · FIPS 21007

Ballard County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Ballard County / Kentucky Department of Housing, Buildings and Construction Building Inspection

For a project in or near Ballard County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

270-223-8699

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Ballard County Courthouse, 132 North 4th Street, Wickliffe, KY 42087; state/local inspector Michael Sullivan serves Ballard County.

Operating hours

N/A for building inspection; plumbing office hours are Tuesday, 12:30-1:30 p.m. CST.

Review expectation

N/A. No published building-plan review timeline was found.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Ballard County

Who handles permitting for this jurisdiction?

Ballard County / Kentucky Department of Housing, Buildings and Construction Building Inspection is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 270-223-8699.

How long might review take?

N/A. No published building-plan review timeline was found.

How are inspections scheduled?

Contact state/local building inspector Michael Sullivan at 270-223-8699 or michaell.sullivan@ky.gov. State electrical inspector Tony Mercer is 270-601-1698; HVAC inspector Andy Suiter is 270-356-6319. Plumbing inspector Robert ‘Lynn’ Bundy is 270-210-6293; plumbing office hours are Tuesday 12:30-1:30 p.m. CST at Ballard County Health Department, 198 Bluegrass Drive, La Center, KY 42056, 270-665-5432.

Which codes and exemptions should I review?

The official Kentucky inspector sheet identifies Michael Sullivan as Ballard County’s state and local building inspector. The statewide framework is the 2018 Kentucky Building Code and 2018 Kentucky Residential Code, based on the 2015 IBC/IRC with Kentucky amendments. No newer 2026 code adoption was verified. No Ballard County-specific minor-work exemption list was published. Applicable Kentucky code exemptions generally include qualifying small detached sheds/playhouses, fences up to 7 feet, retaining walls up to 4 feet, sidewalks/driveways, ordinary finish work, qualifying awnings and decks, and certain minor electrical, mechanical, gas, or plumbing work; confirm with Michael Sullivan before relying on an exemption.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?