Franklin County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Franklin County Department of Planning and Program Development / Zoning Administrator

For a project in or near Franklin County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

641-456-4090

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Franklin County Department of Planning and Program Development, 123 1st Avenue SW, PO Box 58, Hampton, IA 50441

Operating hours

Monday-Friday 8:00 a.m.-4:00 p.m.; confirm zoning staff availability before visiting

Review expectation

N/A; the reviewed county materials do not publish a general review timeline. The published permit form states that a building permit is valid for one year from the date granted.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Franklin County

Who handles permitting for this jurisdiction?

Franklin County Department of Planning and Program Development / Zoning Administrator is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 641-456-4090 and request the current application route before preparing a final submittal.

How long might review take?

N/A; the reviewed county materials do not publish a general review timeline. The published permit form states that a building permit is valid for one year from the date granted.

How are inspections scheduled?

Submit the county zoning certificate/building permit application with the required site plan, dimensions, setbacks, legal description, contractor information, and applicable septic/well, DNR floodplain, special-exception/conditional-use, or variance documentation. The form directs applicants to the Planning and Program Development/Zoning office at 641-456-4090. No online inspection-booking portal or published inspection timetable was located.

Which codes and exemptions should I review?

Franklin County Chapter 70 (2024 Code) requires a county zoning permit before construction, reconstruction, conversion, alteration, enlargement, extension, razing, moving, or use of a building or land. Applications require a plot plan with lot and foundation dimensions, setbacks, accessory structures, and floodplain delineation approved by the County Engineer and Soil Conservation Director. The county also administers floodplain development permits and separate special-exception/conditional-use and variance processes. No specific 2026 county technical building-code edition was identified; applicable Iowa State Building Code, electrical, plumbing, mechanical, septic, health, and municipal requirements remain separate. Except to the extent required to implement Iowa Code section 335.2, Franklin County Chapter 70 exempts land, farmhouses, farm barns, farm outbuildings, and other structures primarily adapted for agricultural use while so used. Floodplain structures and activities remain subject to the county chapter. The published permit form separately lists Agricultural Use as no fee. Non-agricultural buildings, additions, fences, decks, sheds/accessory buildings, remodeling projects, and signs require the county zoning certificate/building permit. No separate minor/cosmetic exemption list was found.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?