County Permit SearchU.S. compliance directory
IndianaPulaski County

Administrative overview · FIPS 18131

Pulaski County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Pulaski County Building, Planning, and Zoning Department

For a project in or near Pulaski County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

574-946-7858; cell 574-242-2046

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Pulaski County Courthouse, 112 E Main Street, Room 212, Winamac, IN 46996

Operating hours

Monday-Friday 8:00 a.m.-4:00 p.m. Eastern Time; call ahead because staff may be out for inspections or appointments.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Pulaski County

Who handles permitting for this jurisdiction?

Pulaski County Building, Planning, and Zoning Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 574-946-7858; cell 574-242-2046 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Call or email the department to schedule inspections, generally in the earlier part of the business day, and call ahead to confirm staff availability. The application requires site/construction plans and any applicable town and health permits before submission. Permits are valid for one year; inspections beyond the fourth contact may incur additional fees.

Which codes and exemptions should I review?

Pulaski County Unified Development Ordinance Ordinance 2025-03, effective March 3, 2025, county building ordinances, and the adopted Indiana State Building Code and related Indiana residential, electrical, plumbing, mechanical, energy, fire, and fuel-gas codes. The county checklist identifies no permit for painting, siding, ordinary flooring, ordinary cabinets, ordinary fences, patios, and similar cosmetic work; interior remodel permits are generally limited to new walls or structural changes. Roof work requires a permit when structure changes or metal installation is involved; doors/windows/skylights require permits for new or larger openings; sheds require permits over 144 square feet; ramps, retaining walls, and sidewalks generally require permits when more than 30 inches above grade, with handicap ramps exempt. Agricultural exemptions still require inspections to be arranged separately.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?