County Permit SearchU.S. compliance directory
IndianaBoone County

Administrative overview · FIPS 18011

Boone County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Boone County Area Plan Commission

For a project in or near Boone County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

765-482-3821

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

116 W. Washington Street, Suite 101, Lebanon, IN 46052

Operating hours

Monday-Friday, 8:00 a.m.-4:00 p.m.

Review expectation

N/A; the 2026 packet states that staff reviews the submittal before emailing instructions for filing and payment, but gives no standard review time.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Boone County

Who handles permitting for this jurisdiction?

Boone County Area Plan Commission is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 765-482-3821 and request the current application route before preparing a final submittal.

How long might review take?

N/A; the 2026 packet states that staff reviews the submittal before emailing instructions for filing and payment, but gives no standard review time.

How are inspections scheduled?

Submit an inspection estimate with the permit application and contact the Area Plan Commission at 765-482-3821 or the listed permit staff for inspection questions and scheduling. Reinspection/additional-inspection charges must be paid before the next inspection or Certificate of Occupancy.

Which codes and exemptions should I review?

Applicable Indiana building and energy codes; the 2026 residential packet specifically requires the 2020 Energy Code for new conditioned buildings and additions. The county's application materials also require structural, HVAC, plumbing, and electrical plans and code compliance documentation. Fences under six feet do not require a permit. The residential packet treats structures over 50 square feet, accessory structures, additions, pools, and taller fences as permit categories; a complete cosmetic-work exemption list was not identified.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?