County Permit SearchU.S. compliance directory
FloridaHernando County

Administrative overview · FIPS 12053

Hernando County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Hernando County Building Division

For a project in or near Hernando County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

352-754-4050

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

789 Providence Boulevard, Brooksville, FL 34601

Operating hours

Office Monday-Friday, 7:30 AM-4:00 PM; lobby Monday, Tuesday, Thursday and Friday, 7:30 AM-3:30 PM; Wednesday lobby, 9:00 AM-3:30 PM.

Review expectation

N/A; the County publishes no dependable general review deadline and offers private-provider review and inspection for modified turnaround. An uncollected application becomes void after 180 days; a permit becomes invalid if work does not begin or activity and inspections lapse for 180 days, and expires after two years if not finalized.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Hernando County

Who handles permitting for this jurisdiction?

Hernando County Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 352-754-4050.

How long might review take?

N/A; the County publishes no dependable general review deadline and offers private-provider review and inspection for modified turnaround. An uncollected application becomes void after 180 days; a permit becomes invalid if work does not begin or activity and inspections lapse for 180 days, and expires after two years if not finalized.

How are inspections scheduled?

Contractors schedule and manage inspections through Civic Access. Owner-builders may email bldg@hernandocounty.us or call 352-754-4050. Required inspections are identified at permit issuance; work must not be covered or advanced before approval. Request the final inspection within ten working days after completion and a recalled red-tag inspection within seven working days, with fees paid. No inspection activity for 180 days constitutes abandonment and invalidates the permit.

Which codes and exemptions should I review?

8th Edition (2023) Florida Building Code, including Building, Residential, Existing Building, Energy Conservation, Fuel Gas, Mechanical, Plumbing and Accessibility requirements, plus the 2020 National Electrical Code and applicable Hernando County construction, zoning and floodplain ordinances. The County's official no-permit list includes roof-covering repairs under 100 square feet, liquid roof coatings, painting, non-fire-rated ceramic tile, carpet and other finish flooring, playground equipment, interior doors and trim in unchanged openings, window air conditioners using an existing outlet, repair of existing air-conditioning equipment, garage-door openers using existing power, nonstructural rain gutters, residential pool resurfacing, pull-down attic stairs in an existing opening, like-for-like light fixtures, fans, receptacles and switches, residential low-voltage internet/cable/security work, like-for-like faucets, sinks and toilets, countertops and replacement cabinets without electrical or plumbing reconfiguration, glass-only replacement in existing frames, residential fences under seven feet unless supported by masonry or concrete columns, rescreening, shower-glass repair, same-type/same-location water heaters, nonstructural garden borders, sand-set pavers outside pool/spa decks, and manufactured pools under 24 inches deep. Exempt work must still meet building, zoning and other applicable codes. Qualifying nonresidential farm buildings have a separate affidavit process.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?