Solano County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Solano County Department of Resource Management - Building & Safety Services

For a project in or near Solano County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(707) 784-6765; 24-hour inspection request line (707) 784-4750

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Solano County Building & Safety Services, 675 Texas Street, Suite 5500, Fairfield, CA 94533

Operating hours

Monday-Friday, 8:00 a.m.-5:00 p.m.; closed noon-1:00 p.m.

Review expectation

N/A; the County explains that plan review begins after electronic submittal and payment of plan-check fees, but does not publish a standard review duration. Timing varies by project type, completeness, corrections, and agency requirements.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Solano County

Who handles permitting for this jurisdiction?

Solano County Department of Resource Management - Building & Safety Services is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (707) 784-6765; 24-hour inspection request line (707) 784-4750.

How long might review take?

N/A; the County explains that plan review begins after electronic submittal and payment of plan-check fees, but does not publish a standard review duration. Timing varies by project type, completeness, corrections, and agency requirements.

How are inspections scheduled?

Call the 24-hour inspection request line at (707) 784-4750 and leave the permit number, job-site address, inspection type, and callback number. Requests made before 3:00 p.m. are scheduled for the following business day; later requests are scheduled two business days later. Specific times cannot be requested. Keep approved plans and the permit card on site, and do not cover work before inspection.

Which codes and exemptions should I review?

Solano County's current requirements page lists the 2025 California Building Code, 2025 California Residential Code, 2025 California Mechanical Code, 2025 California Electrical Code, 2025 California Plumbing Code, 2025 California Fire Code, 2025 California Energy Code, 2025 California Green Building Standards Code, 2025 California Wildland-Urban Interface Code, and 2025 California Existing Building Code, with applicable County ordinances and fire-hazard-severity-zone requirements for unincorporated areas. Under the County's CBC Section 105.2 guidance, exemptions include one-story detached accessory sheds/storage buildings/playhouses up to 120 sq. ft. with no utilities; fences up to 6 ft.; oil derricks; retaining walls up to 4 ft. measured from footing bottom unless supporting surcharge or certain liquids; grade-supported water tanks up to 5,000 gallons at no more than a 2:1 height-to-width/diameter ratio (piping and electrical still require permits); qualifying sidewalks and driveways no more than 30 inches above grade; painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; temporary stage sets; qualifying above-ground prefabricated pools under 24 inches deep and 5,000 gallons; agricultural/nursery shade-cloth structures without service systems; residential playground equipment; qualifying wall-supported window awnings projecting no more than 54 inches; and movable fixtures/cases/racks/counters/partitions no higher than 5 ft. 9 in. Commercial or industrial counters still require permits.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?