Who issues permits

Madera County Community and Economic Development Department is the county office listed for building permits in Madera County.

Also listed: Building & Fire Safety Division.

How to get a permit in Madera County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the portal at posse.co.madera.ca.gov.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  5. Get the final approval and keep it with the approved plans and receipts.

Review times

Minimum 15 business days for the first plan review and five business days for subsequent reviews, based on the county's ADU permitting guide; complexity and project size may extend those periods.

Search Madera County permit records

The listing’s online portal is at posse.co.madera.ca.gov ↗. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Madera County Community and Economic Development Department at (559) 675-7821. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Building codes and exemptions

Codes referenced

Madera County applies the 2025 California Building Standards Code (Title 24) for the 2026 cycle, including the California Building/Residential, Mechanical, Plumbing, Electrical, Energy, Green Building, and related state codes, together with applicable county amendments and Wildland-Urban Interface requirements in unincorporated areas.

California: statewide code. Details

Work that may not need a permit

The county's 2025-code exemption sheet lists one-story detached accessory structures up to 120 square feet; fences up to 7 feet; retaining walls up to 4 feet without surcharge; grade-supported tanks up to 5,000 gallons with a 2:1 height-to-width limit; sidewalks and driveways; ordinary finish work; pools under 24 inches; playground equipment; qualifying wall-supported awnings; detached decks up to 200 square feet and 30 inches above grade; temporary decorative lighting; limited receptacle/overcurrent-device work and low-power wiring; minor electrical, gas, and mechanical repairs; portable appliances; minor equipment parts; leak stopping and stoppage clearing that does not replace or rearrange piping; and ordinary repairs that do not affect structure, egress, utilities, public health, or general safety. Emergency repairs require an application by the next business day, and other zoning or trade requirements can still apply.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Call (559) 675-5206 at least 24 hours in advance. Requests must provide the job-site address and nearest cross street, contact person and phone, permit number, and inspection type. Requests received after 4:00 p.m. are processed with the following day's calls. Post the inspection card and keep stamped approved plans at the site; inspections proceed through the required ground plumbing/setback, foundation, framing, rough-trade, and final stages.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Madera County's current fee-study materials identify an investigative penalty for work begun without a permit equal to the amount of the building permit, in addition to the permit and other applicable fees. Payment of the investigation fee does not excuse compliance with the building code or other legal penalties; the county may require correction, inspection, and approval before occupancy or utility connections.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at (559) 675-7821 about:

  • Fees: the current fee schedule and an estimate for your project.

California rules that apply in Madera County

These rules come from California law and state agencies, so they apply in Madera County on top of anything the local office requires.

Building code

Statewide code

The 2025 California Building Standards Code (Title 24) has applied statewide since January 1, 2026. It includes the California Building Code (Part 2), California Residential Code (Part 2.5), California Electrical Code (Part 3), California Mechanical Code (Part 4), California Plumbing Code (Part 5), California Energy Code (Part 6), the new California Wildland-Urban Interface Code (Part 7), the California Existing Building Code (Part 10) and CALGreen (Part 11).

Read more

The building, residential, wildland-urban interface, fire and existing building parts are based on the 2024 International Codes. The electrical code is based on the 2023 National Electrical Code, and the plumbing and mechanical codes on the 2024 Uniform Plumbing and Mechanical Codes, all with California amendments. Cities and counties may adopt local amendments, usually stricter than Title 24, with findings that they are reasonably necessary because of local climatic, geological, topographical or environmental conditions. These amendments take effect only once filed with the Building Standards Commission or another appropriate state agency.

California Building Standards Commission (Department of General Services) ↗

Outside city limits

State law requires the building department of every city, county, or city and county to enforce Title 24 and the State Housing Law. In unincorporated areas, the county building department (often part of a planning, building or development services agency) issues building permits and does inspections.

Read more

Inside an incorporated city, the city's building department does. Septic systems, wells and coastal development permits often go through separate county or state offices.

Contractor and trade licensing

The Contractors State License Board (CSLB) licenses contractors statewide. Classifications include General Building (B), Residential Remodeling (B-2) and specialty trades such as Electrical (C-10), Plumbing (C-36), Warm-Air Heating, Ventilating and Air-Conditioning (C-20), Roofing (C-39) and Solar (C-46).

Read more

Since January 1, 2025 (AB 2622), the minor work exemption covers jobs under $1,000 in total labor and materials, up from $500. As of October 2026 the limit is still $1,000. The exemption does not apply if the work needs a building permit of any kind or the unlicensed person employs anyone on the job. Unlicensed people advertising for such work must say in the ad that they are not licensed. Owner-builders (Business and Professions Code section 7044) do not need a license. For improvements to an existing home, the home must be your principal residence, you must have lived there for the 12 months before the work is completed, the work must be done before any sale, and you can use the exemption on no more than two structures in any three-year period. For new homes built for sale, an owner-builder is limited to four or fewer structures a year using licensed subcontractors, with no limit if a licensed General Building (B) contractor does the work. Owner-builders who hire unlicensed helpers may be treated as employers. That can bring payroll tax and workers' compensation duties.

Electrical, plumbing and HVAC

California has no separate state license for plumbing or HVAC businesses. They are licensed as CSLB specialty contractors (C-36 Plumbing, C-20 Warm-Air Heating, Ventilating and Air-Conditioning), and electrical contractors hold a C-10 license.

Read more

Individual electricians who work for a C-10 contractor must also be certified by the Division of Labor Standards Enforcement (Department of Industrial Relations) under Labor Code section 108. Trade permits and inspections are handled by the local city or county building department, and owner-builders can do their own trade work on qualifying projects under the owner-builder exemption.

State programs that can affect your permit

Automated permitting for home solar (SB 379)

Most cities and counties must use an online, automated permitting platform that checks code compliance and issues permits in real time for residential solar systems up to 38.4 kW AC, and for battery storage paired with them. Larger jurisdictions had to comply by September 30, 2023 and those with 50,000 or fewer people by September 30, 2024. Cities under 5,000 people and counties under 150,000 people are exempt. The California Energy Commission says cities in those smaller counties may also be exempt.

Official page: energy.ca.gov ↗

Wildland-Urban Interface Code (Title 24, Part 7)

The 2025 code created a new California Wildland-Urban Interface Code. It is based on the International Wildland-Urban Interface Code and gathers the state's wildfire-resistant construction rules, including the old California Residential Code section R337, in one place. It applies to homes built in wildland-urban interface areas, and the residential code notes that it can apply even to work that is exempt from a building permit.

Official page: dgs.ca.gov ↗

ADUs in the coastal zone

Within the coastal zone, ADUs need a coastal development permit as well as a building permit. State ADU law requires the local government to approve or deny an ADU coastal development permit within 60 days of a complete application, without a public hearing. Under AB 462 (2025), a locally approved coastal permit for an ADU-only or JADU-only project can no longer be appealed to the Coastal Commission.

Official page: documents.coastal.ca.gov ↗

Verified October 28, 2026 against California sources. California permit rules, sources and other counties

Common projects in Madera County

California has statewide rules on file for 2 of these projects; they apply in Madera County along with local permit requirements.

  • Rooftop solar

    Most cities and counties must offer online, automated, real-time permitting for residential solar systems up to 38.4 kW AC and paired battery storage (SB 379). Small cities (under 5,000 people) and counties under 150,000 people are exempt.

    California source: energy.ca.gov ↗ · Rooftop solar permit guide

  • Accessory dwelling units

    State ADU law limits how cities and counties can regulate ADUs and junior ADUs. Local ADU ordinances must follow Government Code section 66314 (section 66333 for JADUs) and must not unduly restrict ADUs.

    Read more

    In the coastal zone, the local government must approve or deny the ADU's coastal development permit within 60 days of a complete application, without a public hearing.

    California source: documents.coastal.ca.gov ↗ · Accessory dwelling units permit guide

Named in Madera County’s exemption summary (read it before assuming the work is exempt): Decks · Fences · Sheds and accessory buildings · Heating and air conditioning · Electrical work · Pools and spas · Driveways and culverts

Guides for other projects: Roof replacement · Water heaters · Demolition · Plumbing work · Septic systems · Floodplain development · Kitchen and bathroom remodels · Home additions and garages · All 21 project guides

Other permits you may need in Madera County

These are separate from the building permit and come from the agencies named, under California rules.

  • Septic system

    Local agencies (county environmental health departments) under the State Water Resources Control Board OWTS Policy

    County environmental health departments and other local agencies issue septic (OWTS) permits under the State Water Board's OWTS Policy. Where the Regional Water Board has approved a Local Agency Management Program (LAMP), its local siting and design standards apply; otherwise the policy's statewide Tier 1 standards apply. Systems over 10,000 gallons per day fall outside the policy and go to the Regional Water Board.

    Official page: waterboards.ca.gov ↗ · Septic permit guide

  • Driveway and culvert

    Caltrans (district encroachment permit offices); county public works for county roads

    A driveway, mailbox or other encroachment in state highway right-of-way needs a Caltrans Encroachment Permit, applied for on the Standard Encroachment Permit Application (TR-0100) through the CEPS online system or the district office.

    Read more

    Fees depend on the work, and a deposit is usually due when you apply. Driveways onto county roads are permitted by the county.

    Official page: dot.ca.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    State Water Resources Control Board and Regional Water Boards

    Projects that disturb one acre or more of soil, or less if part of a larger common plan of development, need coverage under the statewide Construction Stormwater General Permit (Order 2022-0057-DWQ, effective September 1, 2023), enrolled through the SMARTS system. Projects in the Lake Tahoe Basin use a separate Lahontan Regional Water Board permit.

    Official page: waterboards.ca.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Madera County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at (559) 675-7821 if you are unsure.

Can I apply for a permit online in Madera County?

Yes. The listing includes an online permit portal at posse.co.madera.ca.gov. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Madera County?

Madera County Community and Economic Development Department has no fee schedule online, so the cost has to come from the office. Call the office at (559) 675-7821 with the project type, size and estimated value for a quote.

How do I look up past permits for an address in Madera County?

Start with the portal at posse.co.madera.ca.gov and search by address, parcel or permit number. If an older permit is not there, ask the office at (559) 675-7821 for the file or send a public records request.

Can I check a contractor's license for work in Madera County?

Yes, at cslb.ca.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Madera County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Madera County borders Fresno County, Mariposa County, Merced County, Mono County, Tuolumne County.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Madera County.