County Permit SearchU.S. compliance directory
AlabamaLee County

Administrative overview · FIPS 01081

Lee County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Lee County Building Inspections Department

For a project in or near Lee County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(334) 737-7014

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Lee County Building Inspections, 100 Orr Avenue, Opelika, AL 36803; mailing address P.O. Box 362, Opelika, AL 36803

Operating hours

Monday-Friday, 7:00 AM-3:30 PM CST; inspectors’ direct office hours are listed as 7:00-8:00 AM and 2:30-3:30 PM.

Review expectation

N/A — the verified county materials specify inspection lead time but do not give a general plan-review or permit-issuance timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Lee County

Who handles permitting for this jurisdiction?

Lee County Building Inspections Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (334) 737-7014.

How long might review take?

N/A — the verified county materials specify inspection lead time but do not give a general plan-review or permit-issuance timeline.

How are inspections scheduled?

Call Lee County Building Inspections at (334) 737-7014 or email buildinginspection@leeco.us. Requests require 24-hour advance notice; requests made before 2:00 PM on normal business days are scheduled for the next day. Required stages include footing/foundation, slab and under-slab utilities, framing, trade rough-ins, insulation/pre-drywall, permanent power when applicable, and final inspection before a Certificate of Occupancy.

Which codes and exemptions should I review?

N/A for a specific 2026 edition. Official Lee County documents refer to the Lee County Building and Administrative Codes and Alabama energy codes, and the commercial application includes IECC/ASHRAE compliance fields, but the exact currently adopted code editions were not stated in the verified 2026 materials. The verified county documents do not publish a complete minor/cosmetic exemption list. Separate permits are required for building, mechanical, electrical and plumbing work when applicable; septic approval, flood-hazard review, erosion-control measures and county-road access approvals may also be required depending on the project.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?