Who issues permits

Custer County Planning Department is the county office listed for building permits in Custer County.

How to get a permit in Custer County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the iWorQ portal at custercountysd.portal.iworq.net, or with the published application forms.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Search Custer County permit records

The listing’s online portal is at custercountysd.portal.iworq.net ↗ and runs on iWorQ. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Custer County Planning Department at 605-673-8174. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Custer County Planning Department publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

Custer County expressly states that it has no county zoning or locally adopted building code. Ordinance 2 requires construction generally to comply with applicable South Dakota regulations and sound engineering and safety practices; the county does not inspect footings, foundations, framing, or finished structures, while state inspectors handle plumbing and electrical work.

South Dakota: partial statewide code. Details

Work that may not need a permit

No building permit is required for a non-living structure without water or sewer that is 160 square feet or smaller, but the county requires a no-permit information form. Ordinance 2 also exempts attached residential appurtenances such as decks, porches, and window awnings; canopy carports; agricultural structures under 300 square feet; remodeling, normal maintenance, and repairs that do not enlarge the building; fences, corrals, livestock enclosures, swings/play equipment; and finish work such as painting, papering, tiling, carpeting, or cabinetry. Non-enlarging fire/storm repairs are exempt unless in a flood-hazard area or involving a nonconforming structure.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Call the Planning Department at 605-673-8174. The county requires final inspections of approaches to public roads and onsite wastewater systems, and septic installation must remain uncovered for inspection. It does not inspect footings, foundations, framing, or finished buildings; arrange electrical and plumbing inspections with the applicable South Dakota state inspectors.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Work begun before obtaining a building/relocation permit is charged the normal permit plus a late application penalty. The current iWorQ portal and fee schedule state $500 per structure per year when the unpermitted structure is 0-5 years old and $1,000 per structure per year when it is 6-10 years old. An expired permit also bars further work until an extension is obtained.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 605-673-8174 about:

  • Review times: how long plan review currently takes. The county publishes no standard review-time estimate and advises that incomplete submissions cause delays. A permit expires if work has not begun within six months or has not been substantially completed within one year; further work then requires an extension.

South Dakota rules that apply in Custer County

These rules come from South Dakota law and state agencies, so they apply in Custer County on top of anything the local office requires.

Building code

Partial statewide code

Under SDCL 11-10-5, a city or county that adopts a building code for buildings other than houses must base it on the 2024 International Building Code, and it may amend it. Where no local code has been adopted, buildings started after July 1, 2026 must still be designed to the 2024 IBC (SDCL 11-10-6).

Read more

This does not cover one- and two-family homes, townhouses, manufactured homes or farmsteads, and there is no state inspection to enforce it. For houses, a city may adopt the 2024 International Residential Code and amend it. It may not require fire sprinklers or make the code stricter than the 2024 IRC (SDCL 11-10-12). Senate Bill 129 (2026 Session Laws ch. 59) moved these references from the 2021 to the 2024 codes. The 2009 International Energy Conservation Code is only a voluntary standard for new homes (SDCL 11-10-7). Electrical work follows the 2023 National Electrical Code, which took effect November 12, 2024. Plumbing follows the 2024 Uniform Plumbing Code, which took effect October 28, 2025. Both apply statewide.

No state building code agency; codes are set by statute (SDCL chapter 11-10) and enforced by local governments ↗

Outside city limits

No state building permit applies outside city limits. A county may adopt the IBC for buildings other than houses (SDCL 11-10-5). Whether a county requires a building or zoning permit for a house depends on its own ordinances, so check with the county planning and zoning office.

Read more

Statewide, electrical and plumbing work in rural areas still needs a state permit and state inspection. Septic systems must follow state rules and be installed by a certified installer.

Contractor and trade licensing

South Dakota does not license general contractors or remodelers. Anyone contracting for construction, or for building, installing or repairing fixtures to real property, must hold a contractor's excise tax license from the Department of Revenue.

Read more

Contractors must write that license number on or near the building permit. Some cities license building contractors themselves. Homeowners don't need an electrical license to wire their own detached, owner-occupied single-family home, its accessory buildings, their own farmstead, or a home they are building to live in (SDCL 36-16-15). They don't need a plumbing license for plumbing in a home they own and live in, or one they are building to live in (SDCL 36-25-17). Either way, a homeowner permit and state inspection are required. Homeowner permits can't be used on rental or commercial property.

Electrical, plumbing and HVAC

The South Dakota Electrical Commission licenses electrical contractors, journeyman and Class B electricians, and apprentices. It enforces the 2023 National Electrical Code (ARSD 20:44:14:01) and inspects wiring through state inspectors.

Read more

Rapid City and Sioux Falls run their own electrical inspections inside city limits. The South Dakota Plumbing Commission licenses plumbers, specialty installers and small onsite wastewater installers. Plumbing must follow the 2024 Uniform Plumbing Code with state amendments (SDCL 36-25-15; ARSD 20:54:02:01). State plumbing inspectors cover the state, except in Aberdeen, Brandon, Rapid City, Sioux Falls and Spearfish, which do their own inspections.

State programs that can affect your permit

State electrical inspection (South Dakota Electrical Commission)

All electrical wiring installations must be inspected by a state electrical inspector, except inside Rapid City and Sioux Falls, which inspect their own. Most jobs need a rough-in inspection before walls are covered and a final inspection before occupancy. Homeowners must have an approved homeowner wiring permit before starting work and must show proof of ownership.

Official page: dlr.sd.gov ↗

State plumbing inspection (South Dakota Plumbing Commission)

Every plumbing installation needs a plumbing inspection certificate and a state inspection, except in cities that run their own inspections (Aberdeen, Brandon, Rapid City, Sioux Falls and Spearfish). Homeowners plumbing their own home need a homeowner permit and underground, rough-in and final inspections.

Official page: dlr.sd.gov ↗

Onsite wastewater (septic) systems

Septic systems must meet ARSD chapter 74:53:01. The state certifies septic installers, who must pass a written test given by the Plumbing Commission. Installation plans can be submitted to the Department of Agriculture and Natural Resources. Some counties also require their own septic permits.

Official page: danr.sd.gov ↗

Verified October 28, 2026 against South Dakota sources. South Dakota permit rules, sources and other counties

Common projects in Custer County

South Dakota has statewide rules on file for 2 of these projects; they apply in Custer County along with local permit requirements.

  • Fences

    Counties, cities and townships may not require a building permit to repair or replace, with something substantially similar, a fence panel or post at a detached, owner-occupied single-family home (SDCL 11-10-15). Designated historic properties are an exception.

    Also named in Custer County’s exemption summary.

    South Dakota source: sdlegislature.gov ↗ · Fences permit guide

  • Electrical work

    Electrical work must be inspected by the state Electrical Commission, or by Rapid City or Sioux Falls inside their limits. Homeowners may wire their own detached, owner-occupied single-family home or farmstead without a license, but need an approved homeowner permit before starting (SDCL 36-16-15).

    South Dakota source: dlr.sd.gov ↗ · Electrical work permit guide

Named in Custer County’s exemption summary (read it before assuming the work is exempt): Decks · Kitchen and bathroom remodels

Guides for other projects: Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · Accessory dwelling units · Demolition · All 21 project guides

Other permits you may need in Custer County

These are separate from the building permit and come from the agencies named, under South Dakota rules.

  • Septic system

    South Dakota Department of Agriculture and Natural Resources (DANR)

    DANR's rules (ARSD 74:53:01) set the statewide minimum standards for septic systems, but local governments may have stricter rules, which the county or local planning and zoning office can explain. A conventional system serving an individual home can be designed and installed to the rules without sending plans to DANR, but other systems need DANR plan approval before construction, and the landowner must have a percolation test done before an absorption field is installed. Anyone in the business of installing these systems must hold a state installer certification (ARSD 74:53:02).

    Official page: danr.sd.gov ↗ · Septic permit guide

  • Driveway and culvert

    South Dakota Department of Transportation (SDDOT)

    No one may build a driveway or other access onto a state highway without an SDDOT access permit; the application goes to the SDDOT area engineer for that location, and an access built without a permit must be removed at the owner's expense (ARSD 70:09).

    Read more

    SDDOT shares completed permits with affected local governments. For county or township roads, contact the county or township.

    Official page: dot.sd.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    South Dakota Department of Agriculture and Natural Resources (DANR)

    Construction that disturbs 1 acre or more, including sites that are part of a larger common plan of development, needs coverage under South Dakota's General Permit for Stormwater Discharges Associated with Construction Activities.

    Read more

    A Stormwater Pollution Prevention Plan must be prepared first, and the Notice of Intent must be filed through EPA's CDX portal at least 15 days before construction starts.

    Official page: danr.sd.gov ↗

  • Water well

    South Dakota Department of Agriculture and Natural Resources (DANR), Water Rights Program

    A domestic well needs no water right permit unless use exceeds 25,920 gallons per day or a peak pump rate of 25 gallons per minute; other uses need a water right permit approved before drilling. Wells must be built by a South Dakota licensed well driller unless owners drill their own, and the driller is responsible for meeting state construction standards and submitting well records to DANR. A water sample from each new domestic well must be tested at the state health laboratory or another approved lab.

    Official page: danr.sd.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Custer County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 605-673-8174 if you are unsure.

Can I apply for a permit online in Custer County?

Yes. The listing includes an online permit portal at custercountysd.portal.iworq.net. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Custer County?

Custer County Planning Department publishes its fee schedule online (custercountysd.com). Look up your project type there, and ask the office at 605-673-8174 for an estimate if your project is not listed.

How do I look up past permits for an address in Custer County?

Start with the iWorQ portal at custercountysd.portal.iworq.net and search by address, parcel or permit number. If an older permit is not there, ask the office at 605-673-8174 for the file or send a public records request.

Can I check a contractor's license for work in Custer County?

Yes, at dlr.sd.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Custer County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Custer County borders Fall River County, Oglala Lakota County, Pennington County, Niobrara County (Wyoming), Weston County (Wyoming).

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Custer County.