County Permit SearchU.S. compliance directory
New YorkWarren County

Administrative overview · FIPS 36113

Warren County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Warren County Fire Prevention and Building Code Enforcement Department

For a project in or near Warren County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

518-761-6542

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Warren County Human Services Building, 3rd Floor, 1340 State Route 9, Lake George, NY 12845

Operating hours

Monday-Friday, 8:00 a.m.-4:00 p.m.; permit applicants should arrive by 3:30 p.m.; inspectors are in the office 8:00-10:00 a.m.

Review expectation

The County instructs applicants to allow a minimum of two weeks for plan review before permit issuance.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Warren County

Who handles permitting for this jurisdiction?

Warren County Fire Prevention and Building Code Enforcement Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 518-761-6542.

How long might review take?

The County instructs applicants to allow a minimum of two weeks for plan review before permit issuance.

How are inspections scheduled?

Use the County’s online application walkthrough, review requirements, submit the completed application packet and construction plans in person, and coordinate the inspection checklist with the Building Codes office. The County’s public permit-search portal provides permit and certificate records; call 518-761-6542 for inspection scheduling and project-specific instructions.

Which codes and exemptions should I review?

Warren County administers the New York State Uniform Fire Prevention and Building Code and State Energy Conservation Construction Code throughout the County except the Town of Queensbury and City of Glens Falls, which have their own code offices. The applicable 2025 New York State Uniform Code and 2025 Energy Code became effective December 31, 2025. The County’s permit process follows the Uniform Code exemptions for specified minor work, small detached accessory structures, playground equipment, shallow above-ground pools, non-pool fences, certain retaining walls, temporary stage sets, and wall-supported awnings. Homeowners doing all work may use the BP-1 workers’ compensation affidavit where eligible; that is an insurance exemption, not a building-permit exemption. Confirm permit applicability with the Department.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?