County Permit SearchU.S. compliance directory
KentuckyFloyd County

Administrative overview · FIPS 21071

Floyd County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Kentucky Department of Housing, Buildings and Construction / City of Prestonsburg local building inspection / Floyd County Fiscal Court

For a project in or near Floyd County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

606-422-0251

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

City of Prestonsburg local building inspection, 200 N. Lake Dr., Prestonsburg, KY 41653; Floyd County Fiscal Court, 149 S. Central Ave., Prestonsburg, KY 41653; Floyd County Health Department, 238 Goble Street, Prestonsburg, KY 41653.

Operating hours

N/A for the building inspection office; the Floyd County plumbing inspection office is open Tuesday, 8:00-9:30 a.m. EST.

Review expectation

N/A. No published Floyd County, Prestonsburg, or DHBC plan-review turnaround time was found.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Floyd County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 606-422-0251.

How long might review take?

N/A. No published Floyd County, Prestonsburg, or DHBC plan-review turnaround time was found.

How are inspections scheduled?

For work within Prestonsburg contact local building inspector Jamie Potter at 606-422-0251. For state-jurisdiction building plan review and inspections contact Levi Wells at 606-359-4062 or matthewl.wells@ky.gov. Local electrical matters are directed to the county judge executive’s office or city office where work is performed. State electrical inspector Ron Lewis is 859-358-5982; elevator inspector Rodney Napier is 606-671-1358; HVAC inspector Billy Blair is 502-395-4879; manufactured-housing inspector Randy Jones is 606-872-9306; boiler inspector Scott Shepherd is 502-382-0545. Plumbing inspector Ricky Adams is 606-359-3850, with office hours Tuesday 8:00-9:30 a.m. EST at Floyd County Health Department, 238 Goble Street, Prestonsburg, 606-886-2788 ext. 2.

Which codes and exemptions should I review?

The current DHBC county assignment lists Jamie Potter as the local building inspector for City of Prestonsburg only and Levi Wells as the state building inspector for the remaining state jurisdiction. The applicable statewide framework is the 2018 Kentucky Building Code and 2018 Kentucky Residential Code, based on the 2015 IBC/IRC with Kentucky amendments. No newer 2026 KBC or KRC adoption was verified; DHBC announced July 2026 NEC updates for electrical work. The current assignment does not publish a Floyd County-specific minor or cosmetic exemption list. Confirm maintenance, small accessory work, agricultural work, manufactured housing, and other potentially exempt projects with the City of Prestonsburg or DHBC before beginning. Plumbing, electrical, HVAC, septic, floodplain, and zoning requirements may be separate.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?