County Permit SearchU.S. compliance directory
IndianaJefferson County

Administrative overview · FIPS 18077

Jefferson County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Jefferson County Surveyor, Zoning and Planning Office / Jefferson County Plan Commission

For a project in or near Jefferson County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

812-265-8900; Building Inspector 812-274-3929; Secretary 812-274-3928

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

300 E Main Street, Madison, IN 47250; Surveyor/Zoning/Planning Office, 315 Jefferson Street, Annex Building, Madison, IN 47250

Operating hours

Monday-Friday 8:00 a.m.-4:00 p.m.; closed holidays

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Jefferson County

Who handles permitting for this jurisdiction?

Jefferson County Surveyor, Zoning and Planning Office / Jefferson County Plan Commission is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 812-265-8900; Building Inspector 812-274-3929; Secretary 812-274-3928 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Call Building Inspector Josh Cline at 812-274-3929 or Secretary Taylor Baulac at 812-274-3928 to schedule appointments and inspections. Submit the application, site sketch, health/sewer approval, driveway approval, drawings, and estimated construction cost.

Which codes and exemptions should I review?

Improvement/building permits are required for most construction and improvements. All Class 1 commercial buildings require an Indiana Department of Homeland Security Construction Design Release before county application; the public county page does not identify a specific 2026 code edition. The county states that permits are required for most improvements or construction but does not publish a complete minor/cosmetic exemption list. A septic permit or public sewer tap is required before a building permit, and drawings must show plumbing, electrical, and HVAC where applicable.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?