County Permit SearchU.S. compliance directory
IllinoisJo Daviess County

Administrative overview · FIPS 17085

Jo Daviess County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Jo Daviess County Planning & Development Department

For a project in or near Jo Daviess County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

815-591-3810

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Jo Daviess County Highway Department Building, 1 Commercial Drive, Suite 1, Hanover, IL 61041

Operating hours

Monday-Friday, 8:00 AM-4:00 PM; closed holidays

Review expectation

Approximately 15-20 working days after a complete application packet is received; solar permits may take longer and require utility interconnection sign-off.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Jo Daviess County

Who handles permitting for this jurisdiction?

Jo Daviess County Planning & Development Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 815-591-3810 and request the current application route before preparing a final submittal.

How long might review take?

Approximately 15-20 working days after a complete application packet is received; solar permits may take longer and require utility interconnection sign-off.

How are inspections scheduled?

Call Planning & Development at 815-591-3810 before work is ready and give 24 hours advance notice for footing forms before concrete, completed framing before siding, rough electrical/plumbing/mechanical before insulation, and final inspection before occupancy. A certificate of occupancy is issued after an approved final inspection.

Which codes and exemptions should I review?

Current county code (2025 S-7) adopts the 2021 International Building Code, 2021 International Residential Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2021 International Energy Conservation Code as amended by Illinois, 2020 National Electrical Code, 2014 Illinois Plumbing Code, and 2018 Illinois Accessibility Code. The county code exempts one-story detached accessory structures other than storm shelters when the floor area does not exceed 120 square feet. The building official may waive professional-design or plan-submission requirements for work under $25,000 and for limited work such as like-for-like fixture/door/window replacement, nonstructural reroofing, landscaping, patios, sidewalks, driveways, and similar activities; agricultural-building applications need only an accurate site plan.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?