Who issues permits

No countywide building permit office was identified for Fayette County. The listing points to Fayette County Government. Inside city or town limits, the city or town issues building permits.

No current general county building-permit department was identified on the official county website, so ordinary permitting must be confirmed with the applicable municipality.

Outside city limits in Illinois

Outside city and village limits, building permits come from the county, and only if the county board has adopted a building code. Many rural counties have not adopted one, so there is no county building permit for a house, though county zoning, floodplain, health department septic, and well permits may still apply.

Read more

Under the county zoning statute (55 ILCS 5/5-12001), agricultural buildings on farmland are exempt from county building code requirements for permit fees and occupancy permits. Counties apply this exemption differently. Jersey County, for example, still requires a permit application for farm buildings, and both Jersey and Tazewell counties say that homes and buildings used by the public do not qualify. Where a county has no code, the Residential Building Code Act still requires a contract for a new home to name a residential code.

More Illinois rules below · Confirm with the office at 618-283-5000 before you build.

How to get a permit in Fayette County

  1. Find the office for your address: the city or town if you are inside its limits; outside them, the Illinois rule above decides.
  2. Request the application from the office at 618-283-5000; no form or portal is published online.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Ask which inspections are required when the permit is issued, and keep work uncovered until each one passes.
  5. Get the final approval and keep it with the approved plans and receipts.

Search Fayette County permit records

No online permit portal is listed, so permit history is kept by Fayette County Government. Call 618-283-5000 or visit Fayette County Courthouse, 211 South 7th Street, Vandalia, IL 62471 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.

Inside a city or town, permit records are kept by that municipality’s building department, not by Fayette County.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Not published online

We did not find these in the office’s online materials. Ask the office at 618-283-5000 about:

  • Fees: the current fee schedule and an estimate for your project.
  • Building codes: which code edition and local amendments apply. Not available countywide. The official county website does not identify a current county building-code edition or general county building-permit authority; applicable municipal and Illinois state requirements govern.
  • Exempt work: which minor work needs no permit. Not available countywide. No current county minor/cosmetic exemption list was published; contact the municipality with jurisdiction over the parcel.
  • Inspections: which inspections are required and how to request them. Not available for county building inspections. Contact the applicable municipality for permit and inspection scheduling.
  • Review times: how long plan review currently takes.
  • Work without a permit: the penalty for starting work before a permit is issued. Not available countywide. The official county sources reviewed did not publish a general county building-permit penalty; municipal and state enforcement rules apply.

Illinois rules that apply in Fayette County

These rules come from Illinois law and state agencies, so they apply in Fayette County on top of anything the local office requires.

Building code

Partial statewide code

There is no statewide building code that local governments must enforce through permits. Under Public Act 103-0510, starting January 1, 2025, any local code must regulate structural design at least as strictly as the International Residential Code (IRC) for homes.

Read more

Local governments must also report the code title, edition, and amendments to CDB at least 30 days before it takes effect. In places with no building code, the Illinois Residential Building Code Act (815 ILCS 670/15) requires every contract for new home construction to adopt a residential code. The builder and buyer may agree on the IRC or on any city or county residential code in effect within 100 miles of the home. If they do not agree, the current IRC applies. Several state codes apply alongside local codes. The Illinois Energy Conservation Code (2024 IECC with Illinois amendments) took effect November 30, 2025, replacing the 2021 edition. The Illinois Plumbing Code (77 Ill. Adm. Code 890) also applies. The Illinois Accessibility Code covers homes only if they are owned, leased, or financed by a government unit.

Illinois Capital Development Board (CDB) ↗

Contractor and trade licensing

Illinois has no state general contractor or home improvement contractor license, and IDFPR's list of regulated professions includes no general contractor category. Any general contractor licensing or registration is local.

Read more

Two trades are licensed statewide. Roofing contractors are licensed by IDFPR under the Illinois Roofing Industry Licensing Act (225 ILCS 335). A limited license covers residential properties and condominium buildings with no more than eight units, and an unlimited license also covers commercial and industrial work. A licensed roofer's number starts with 104 and must appear on contracts, bids, and building permit applications. Plumbers and plumbing contractors are licensed by IDPH. Separately, the Home Repair and Remodeling Act (815 ILCS 513) requires anyone in the home repair business to give customers the Attorney General's "Home Repair: Know Your Consumer Rights" brochure. For jobs over $1,000, the contractor must also provide a written contract stating the total cost and have the customer sign an acknowledgment of the brochure. Whether a homeowner can pull their own building permit is up to the city or county that issues it.

Electrical, plumbing and HVAC

Plumbing is regulated at the state level. Under the Illinois Plumbing License Law (225 ILCS 320), IDPH licenses plumbers, apprentice plumbers, plumbing contractors, and irrigation contractors.

Read more

Local governments, including home rule units, cannot license plumbers. The Illinois Plumbing Code (77 Ill. Adm. Code 890) covers new plumbing in all new construction and any remodeling that alters or replaces plumbing. A homeowner may do their own plumbing on a single-family home without a license, as long as they own or rent it and live there, or are building it to live in. The work must meet the state plumbing code and is subject to inspection by IDPH or by a local government that employs a licensed plumber as inspector. The owner may not hire anyone except a licensed plumber to help. To qualify as an occupant, you must live in the home as your only residence, or intend to for at least six months after the work is finished. Electricians are not licensed by the state, and electrician licensing does not appear on IDFPR's list of regulated professions. HVAC contractors are not on the list either. Electrical and mechanical licensing and permits, where they exist, are handled by cities, villages, and counties. IDPH licenses water well and pump installation contractors and private sewage disposal (septic) contractors.

State programs that can affect your permit

Private sewage disposal (septic) systems

IDPH regulates the installation of all private sewage disposal systems that have no surface discharge, such as septic tanks and seepage fields. It also regulates systems that discharge up to 1,500 gallons per day of treated effluent to the ground surface, such as sand filters and aerobic units, under the Private Sewage Disposal Code (77 Ill. Adm. Code 905). Plans are reviewed and approved before construction, usually by one of about 90 local health departments acting under a local ordinance or as IDPH's agent. Installers and pumpers are licensed by IDPH.

Official page: dph.illinois.gov ↗

Private water wells

IDPH regulates the construction, modification, and sealing of all water wells except community water wells, and of closed loop (geothermal) wells. The work is done through agreements with 90 local health departments, which review plans, issue permits for new wells, and inspect them. Well drillers and pump installers must be licensed by IDPH.

Official page: dph.illinois.gov ↗

Modular and manufactured homes

IDPH reviews plans for every modular home model placed in Illinois for structural, mechanical, plumbing, electrical, and energy standards. Manufactured homes must be installed by an Illinois-licensed manufactured home installer or by the homeowner. They must follow the manufacturer's instructions, or the state Manufactured Home Installation Code if no instructions are available. Manufactured homes moved since January 1, 1980, must be tied down with equipment that meets IDPH standards.

Official page: dph.illinois.gov ↗

State floodway permits

The Illinois Department of Natural Resources, Office of Water Resources, issues permits for work in and along the state's rivers, lakes, and streams, including construction in floodways. Some small projects are covered by statewide or regional permits and need no application, as long as they stay within the permit's limits.

Official page: dnr.illinois.gov ↗

Verified October 28, 2026 against Illinois sources. Illinois permit rules, sources and other counties

Common projects in Fayette County

Illinois has statewide rules on file for 2 of these projects; they apply in Fayette County along with local permit requirements.

  • Roof replacement

    Anyone paid to do roofing work must hold an IDFPR roofing contractor license. A limited license covers homes and condominium buildings of up to eight units. The license number must appear on contracts, bids, and permit applications. Owners may roof their own building without a license, but may not hire an unlicensed roofer.

    Illinois source: idfpr.illinois.gov ↗ · Roof replacement permit guide

  • Water heaters

    Plumbing work in Illinois must be done by an IDPH-licensed plumber and must meet the Illinois Plumbing Code, which covers any remodeling that alters or replaces plumbing. The exception is an owner-occupant doing the work on their own single-family home. Local permit and inspection rules also apply.

    Illinois source: dph.illinois.gov ↗ · Water heaters permit guide

Guides for other projects: Decks · Fences · Sheds and accessory buildings · Heating and air conditioning · Electrical work · Rooftop solar · Pools and spas · Accessory dwelling units · All 21 project guides

Other permits you may need in Fayette County

These are separate from the building permit and come from the agencies named, under Illinois rules.

  • Septic system

    Illinois Department of Public Health and local health departments

    IDPH regulates private sewage disposal systems under the Private Sewage Disposal Code (77 Ill. Adm. Code 905). System plans are reviewed and approved before construction, by IDPH or one of about 90 local health departments that review plans. IDPH also licenses private sewage disposal installation contractors.

    Official page: dph.illinois.gov ↗ · Septic permit guide

  • Floodplain development

    IDNR Office of Water Resources

    IDNR's Office of Water Resources is the state coordinating agency for the NFIP, and participating communities adopt and enforce local floodplain regulations. IDNR also requires its own permit for construction in the floodway of a stream draining 1 square mile or more in urban areas or 10 square miles or more in rural areas, with separate rules for Cook, DuPage, Kane, Lake, McHenry and Will counties.

    Official page: dnr.illinois.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Illinois Department of Transportation (IDOT)

    Driveways onto state highways need an IDOT highway permit, judged under IDOT's Policy on Permits for Access Driveways to State Highways. Requirements vary by district, so applicants work with the IDOT district office that covers their county.

    Official page: idot.illinois.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Illinois Environmental Protection Agency

    Construction that disturbs 1 acre or more, including smaller sites that are part of a larger common plan of development, needs coverage under Illinois EPA's General NPDES Permit for Construction Site Activities. Operators file a Notice of Intent that includes an electronic stormwater pollution prevention plan (SWPPP).

    Official page: epa.illinois.gov ↗

  • Water well

    Illinois Department of Public Health and local health departments

    IDPH and local health departments review water well plans, issue permits for new well construction and inspect wells under the Illinois Water Well Construction Code (77 Ill. Adm. Code 920). Wells are drilled and pumps installed by IDPH-licensed contractors.

    Official page: dph.illinois.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does Fayette County have a countywide building permit office?

No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, Illinois law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.

Can I apply for a permit online in Fayette County?

No online permit portal was found for this listing. Contact the office at 618-283-5000 to ask how applications are accepted.

How much does a building permit cost in Fayette County?

Fayette County Government has no fee schedule online, so the cost has to come from the office. Call the office at 618-283-5000 with the project type, size and estimated value for a quote. Inside a city or town, that municipality’s own fee schedule applies.

How do I look up past permits for an address in Fayette County?

There is no online permit search for this listing. Ask the office at 618-283-5000 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.

Can I check a contractor's license for work in Fayette County?

Yes, at idfpr.illinois.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Fayette County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Fayette County borders Bond County, Clay County, Clinton County, Effingham County, Marion County, Montgomery County, and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Fayette County.