County Permit SearchU.S. compliance directory
HawaiiHonolulu County

Administrative overview · FIPS 15003

Honolulu County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

City and County of Honolulu Department of Planning and Permitting, Building Division

For a project in or near Honolulu County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

808-768-8000

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Frank F. Fasi Municipal Building, 650 South King Street, Honolulu, HI 96813

Operating hours

City business hours are generally 7:45 AM-4:30 PM; confirm counter hours with DPP.

Review expectation

The department states that review time is highly variable and depends on completeness, complexity, compliance, backlog, and outside-agency approvals.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Honolulu County

Who handles permitting for this jurisdiction?

City and County of Honolulu Department of Planning and Permitting, Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 808-768-8000.

How long might review take?

The department states that review time is highly variable and depends on completeness, complexity, compliance, backlog, and outside-agency approvals.

How are inspections scheduled?

Contact the assigned building inspector listed on the permit. Electrical inspection requests must be submitted at least 48 hours (two working days) in advance; general building-permit questions go to 808-768-8000, and permit status is searchable through the department's Building Permit Search.

Which codes and exemptions should I review?

The DPP's current public materials reference the 2018 International Building Code adoption and Revised Ordinances of Honolulu Chapter 18; the complete 2026 code set was not identified on the public FAQ. One-story detached accessory storage, tool, playhouse, or similar buildings serving Group R-3 homes are exempt when the aggregate floor area does not exceed 120 square feet. Agricultural structures qualifying under HRS 46-88 are exempt but must be declared and may not include plumbing or electrical work.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?