County Permit SearchU.S. compliance directory
GeorgiaPaulding County

Administrative overview · FIPS 13223

Paulding County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Paulding County Community Development, Building & Permitting Division

For a project in or near Paulding County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

770-443-7571 (permits); 770-505-1398 (inspections)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

240 Constitution Boulevard, First Floor, Dallas, GA 30132

Operating hours

Monday-Friday, 8:00 AM-5:00 PM

Review expectation

Building permits are issued through the office during 8:00 AM-5:00 PM; inspection requests are generally scheduled for the next business day when possible.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Paulding County

Who handles permitting for this jurisdiction?

Paulding County Community Development, Building & Permitting Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 770-443-7571 (permits); 770-505-1398 (inspections) and request the current application route before preparing a final submittal.

How long might review take?

Building permits are issued through the office during 8:00 AM-5:00 PM; inspection requests are generally scheduled for the next business day when possible.

How are inspections scheduled?

Call 770-505-1398 or email bldginspections@paulding.gov. Post the permit on the lot before requesting inspection; footing, framing/rough, and final inspections are required as applicable. Requests are scheduled for the next business day when possible, and re-inspection fees are $50, $100, and $200 for the first, second, and third-or-more reinspection.

Which codes and exemptions should I review?

Paulding County enforces the current Georgia State Minimum Standard Codes and adopted county building, electrical, HVAC, plumbing, and related development requirements; the reviewed county page does not enumerate a separate 2026 edition list. A fence no more than six feet tall does not require a permit under the county FAQ. The county's forms identify permits for accessory buildings, garages, additions, remodeling, storage buildings, swimming pools, and fences over seven feet; other minor-work exemptions should be confirmed with the division.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?