County Permit SearchU.S. compliance directory
GeorgiaCobb County

Administrative overview · FIPS 13067

Cobb County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Cobb County Community Development - Development and Inspections Division

For a project in or near Cobb County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(770) 528-2060

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

1150 Powder Springs Street, Suite 400, Marietta, GA 30064

Operating hours

Monday-Friday, 8:00 AM-5:00 PM.

Review expectation

N/A; the county warns of extended call wait times during high volume.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Cobb County

Who handles permitting for this jurisdiction?

Cobb County Community Development - Development and Inspections Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (770) 528-2060.

How long might review take?

N/A; the county warns of extended call wait times during high volume.

How are inspections scheduled?

Use the Citizen Access portal: log in, open Record Info under Building Permit, select Inspections, then Schedule or Request an Inspection. Alternatively text SCHEDULE to 877-376-1455; text CANCEL to cancel and RESULTS to check results. Only one inspection may be selected at a time online.

Which codes and exemptions should I review?

Cobb County administers and enforces the applicable Georgia State Minimum Standard Codes for construction in the unincorporated permitting jurisdiction; for 2026 these include the 2024 International Building, Residential, Plumbing, Mechanical, Fuel Gas, Fire, and Swimming Pool and Spa Codes, 2015 International Energy Conservation Code, and 2023 National Electrical Code, with Georgia amendments. N/A; the reviewed county inspection and portal pages do not publish a consolidated minor-work exemption list.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?