County Permit SearchU.S. compliance directory
FloridaPalm Beach County

Administrative overview · FIPS 12099

Palm Beach County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Palm Beach County Planning, Zoning & Building Department, Building Division (unincorporated Palm Beach County)

For a project in or near Palm Beach County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(561) 233-5100; South County Office (561) 276-1385

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

2300 N. Jog Road, West Palm Beach, FL 33411; South County Office, 345 S. Congress Avenue, Delray Beach, FL 33445

Operating hours

Main office Monday-Friday, 8:00 AM-5:00 PM; South County Office Tuesday-Friday, 8:00 AM-5:00 PM

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Palm Beach County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (561) 233-5100; South County Office (561) 276-1385.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Use the ePZB online portal to submit and manage building permits and inspections 24/7, or contact the Building Division at (561) 233-5100.

Which codes and exemptions should I review?

Florida Building Code, 8th Edition (2023), with Palm Beach County amendments; applicable ULDC Article 18 flood-damage-prevention standards and other adopted technical standards Palm Beach County publishes an Items Not Requiring a Permit guidance document and directs applicants to confirm project-specific requirements. The reviewed pages did not expose a complete text list of minor or cosmetic exemptions; confirm with the Building Division before work.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?