Who issues permits

Glades County Community Development, Building Division is the county office listed for building permits in Glades County.

How to get a permit in Glades County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the iWorQ portal at gladescounty.portal.iworq.net.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Review times

Glades County’s economic-development page states that a building permit can be secured in approximately 10-14 business days when stamped, engineered plans are complete; actual timing depends on review and corrections.

Search Glades County permit records

The listing’s online portal is at gladescounty.portal.iworq.net ↗ and runs on iWorQ. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Glades County Community Development at (863) 946-6018. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Glades County Community Development publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

Florida Building Code and applicable Glades County building, zoning, floodplain, land-development, and county-ordinance requirements; the public county page does not name a specific edition.

Florida: statewide code. Details

Work that may not need a permit

Glades County directs applicants to its published 'What Doesn't Need A Building Permit?' guidance and states that work requiring a permit must be performed by a licensed contractor unless the applicant qualifies as an owner-builder. A complete detailed exemption list was not available in the reviewed page text, so minor/cosmetic exemptions are N/A.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Request inspections through the county iWorQ portal or call (863) 946-6018/email the Building Division. Plans review and inspections are performed every day; requests must be received by 4:00 PM the day before to be placed on the next day’s schedule.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Glades County requires an application and permit before construction, alteration, repair, moving, demolition, occupancy change, or covered trade work begins. The reviewed public materials do not state a fixed double-fee amount; violations may be handled through county enforcement and permit remedies.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Florida rules that apply in Glades County

These rules come from Florida law and state agencies, so they apply in Glades County on top of anything the local office requires.

Building code

Statewide code

The Florida Building Code, 8th Edition (2023), took effect December 31, 2023. It was developed from the 2021 International Codes and the 2020 National Electrical Code with Florida-specific changes, and it includes building, residential, existing building, plumbing, mechanical, fuel gas, energy conservation and accessibility volumes.

Read more

Under state law the code applies statewide without local adoption, and local governments may only add more stringent technical amendments. The Commission is required to update the code every three years. The 9th Edition (2026) is based on the 2024 International Codes and the 2023 NEC. The Commission's published effective date for it is December 31, 2026, and its proposed adoption rule was published on September 23, 2026. Until then the 8th Edition applies. The edition in effect on the date you apply for a permit governs that permit for its whole life, including extensions.

Florida Building Commission (Department of Business and Professional Regulation) ↗

Outside city limits

Every local government in Florida must enforce the Florida Building Code. In unincorporated areas the county building department issues permits and does inspections. Inside a city, the city's building department does, unless the city has an agreement with the county or another government to take on that work, which state law allows. Some state facilities, such as hospitals, prisons and elevators, are reviewed by state agencies instead.

Contractor and trade licensing

Florida licenses construction contractors at the state level through the Construction Industry Licensing Board (CILB) at DBPR. A 'certified' contractor holds a state certificate of competency and can work anywhere in Florida.

Read more

A 'registered' contractor has met a local jurisdiction's competency requirements and can work only there. License categories include general, building and residential contractors as well as roofing, sheet metal, air-conditioning (Class A, B and C), mechanical, pool and spa, plumbing, underground utility, solar and specialty contractors. Work valued under $2,500 that is casual, minor or inconsequential is exempt from licensure, but not if it is part of a larger job, if a job is split up to stay under the limit, or if the person advertises as a contractor. Owner-builders (F.S. 489.103(7)): owners may act as their own contractor to build or improve a one- or two-family home or farm outbuilding for their own use, or a commercial building costing up to $75,000. The building must not be built or improved for sale or lease, and selling or leasing it within one year of completion creates a legal presumption that it was. The owner must personally appear and sign the permit application, give direct, onsite supervision of all work not done by licensed contractors, and sign a state disclosure statement. In it the owner accepts responsibility as the party of record, agrees not to hire unlicensed people to act as their contractor, and acknowledges that anyone they hire who is not licensed must be their employee, with tax withholding and workers' compensation.

Electrical, plumbing and HVAC

Plumbing, air-conditioning, mechanical, roofing, sheet metal and pool contractors are licensed by the CILB under Part I of Chapter 489. Electrical and alarm system contractors are licensed by the Electrical Contractors' Licensing Board under Part II, again as either statewide certified or locally registered contractors.

Read more

Trade permits are issued by the local building department. Homeowners: the owner-builder exemption covers plumbing and HVAC work on a one- or two-family home the owner lives in or uses. A separate exemption (F.S. 489.503(6)) lets an owner pull the permit for and do their own electrical work on a single-family or duplex home for their own use, not intended for sale or lease. All owner work must be permitted and inspected.

State programs that can affect your permit

Coastal Construction Control Line (CCCL) permits

On sandy beaches, building or doing related work seaward of the Coastal Construction Control Line needs a CCCL permit from the Florida Department of Environmental Protection in addition to the local building permit. Siting and design standards in this zone can be stricter than elsewhere in the coastal building zone because of the storm forces expected there. DEP has an online map to locate the line.

Official page: floridadep.gov ↗

Septic systems (onsite sewage)

Since July 1, 2021, the Department of Environmental Protection has been responsible for septic (OSTDS) rules. In most counties, the county health department still issues septic construction permits and does the inspections. In the Panhandle counties and Marion County, DEP now handles permitting directly.

Official page: floridadep.gov ↗

Private provider plan review and inspections

Under F.S. 553.791, a property owner, or the owner's contractor with written authorization, may hire a licensed private provider for plan review, building inspections or both instead of the local building department. The owner must notify the building official, and the local government must lower its permit fee by the cost it saves.

Official page: leg.state.fl.us ↗

Verified October 28, 2026 against Florida sources. Florida permit rules, sources and other counties

Common projects in Glades County

Florida has statewide rules on file for 3 of these projects; they apply in Glades County along with local permit requirements.

  • Roof replacement

    Owners may act as their own contractor to repair or replace wood shakes or asphalt or fiberglass shingles on their one-, two- or three-family home after damage from a governor-declared state of emergency, if the home is not offered for sale within a year after the work. A building permit is still required.

    Florida source: leg.state.fl.us ↗ · Roof replacement permit guide

  • Electrical work

    An owner may apply for the permit and do their own electrical work on a single-family or duplex residence for their own use and occupancy, not intended for sale or lease (F.S. 489.503(6)). Electrical work is not covered by the under-$7,500 permit exemption.

    Florida source: leg.state.fl.us ↗ · Electrical work permit guide

  • Demolition

    Local governments may not stop the owner of a single-family home in a coastal high-hazard area, moderate flood zone or special flood hazard area from getting a demolition permit if the lowest floor is at or below base flood elevation.

    Read more

    Such applications get only administrative code review, with no extra local hearings. Homes on the National Register and certain locally designated historic homes are excluded.

    Florida source: leg.state.fl.us ↗ · Demolition permit guide

Named in Glades County’s exemption summary (read it before assuming the work is exempt): Owner-builder permits

Guides for other projects: Decks · Fences · Sheds and accessory buildings · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · Accessory dwelling units · All 21 project guides

Other permits you may need in Glades County

These are separate from the building permit and come from the agencies named, under Florida rules.

  • Septic system

    Florida Department of Environmental Protection (county health departments)

    DEP runs the septic program under s. 381.0065, F.S. and Chapter 62-6, F.A.C. DEP issues permits directly in 16 Northwest Florida counties and Marion County, and county health departments issue them elsewhere.

    Read more

    An application needs a site plan, floor plan and a site evaluation of soil and site conditions, done by the agency or a qualified private evaluator.

    Official page: floridadep.gov ↗ · Septic permit guide

  • Driveway and culvert

    Florida Department of Transportation (county public works for county roads)

    Building, relocating or altering a driveway onto a state highway requires a connection permit from FDOT under Rule Chapter 14-96, F.A.C., applied for through FDOT's One Stop Permitting site. Driveways onto county roads are permitted by the county.

    Official page: flrules.org ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Florida Department of Environmental Protection, NPDES Stormwater Program

    Construction that disturbs one acre or more, or less if part of a larger common plan, and discharges to surface waters or a storm sewer needs coverage under DEP's Construction Generic Permit. File a Notice of Intent at least 2 days before work starts and prepare a stormwater pollution prevention plan. This is separate from any Environmental Resource Permit or local permit.

    Official page: floridadep.gov ↗

  • Water well

    Water management districts (or delegated county agencies)

    A permit from the water management district, or the county or health department it has delegated, is required before a water well is built, repaired or abandoned (Rule 62-532.400, F.A.C.). The owner or the water well contractor applies, and contractors must hold a water well contractor license from a water management district (s. 373.323, F.S.).

    Official page: flrules.org ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Glades County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at (863) 946-6018 if you are unsure.

Can I apply for a permit online in Glades County?

Yes. The listing includes an online permit portal at gladescounty.portal.iworq.net. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Glades County?

Glades County Community Development publishes its fee schedule online (myglades.com). Look up your project type there, and ask the office at (863) 946-6018 for an estimate if your project is not listed.

How do I look up past permits for an address in Glades County?

Start with the iWorQ portal at gladescounty.portal.iworq.net and search by address, parcel or permit number. If an older permit is not there, ask the office at (863) 946-6018 for the file or send a public records request.

Can I check a contractor's license for work in Glades County?

Yes, at myfloridalicense.com. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Glades County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Glades County borders Charlotte County, Hendry County, Highlands County, Lee County, Martin County, Okeechobee County, and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Glades County.